Laserfiche WebLink
ANN110NMENTAL tHMOT Y¢PO¢t,:AOpYNDUN <br />9EPTFM9zx reit <br />A¢iaaiYDNO YANCHAYEYIanU PYOJP.OT <br />� 'aeNTA.ANA,.. AALIPOANIA. <br />23 <br />:AIR QUALITY- <br />xCW <br />More <br />seveg_ <br />nn SuLitaudat <br />Cbaogernm' <br />Would elle fCoJeCl:' <br />.slenianmt <br />1.put <br />rmpocr <br />Prevla¢aAnalpk <br />'(a) <br />Ctiotllet .with or6 struclimplementationoftheapplicable Air <br />0 <br />t)uah Attainrirenl Plan or Con as O dlanae melt Plan^ <br />(b) <br />Violate, anyslanonary source aur quality standard or contribute. <br />El <br />-to ancxistinor roosedair quality violation?� <br />(c) <br />Result in-acumulatively eonsiderublenet increase ofanycriteiin <br />.pollutant far which Ole projex.t region is lion attainment under an <br />❑ <br />Ll <br />9 <br />applicable federator statc?mblent air quulut) standard <br />(including releasing emissions which exceed qutintitalive <br />thresholds for Mone precursors)? <br />Ezpwcscasitir'e receptors W 3ubs[antiai,pplluhtnt <br />0 <br />-[J <br />concentrations? <br />(e)' <br />.Create objemtionuble odors affectitigj l substantial nutiiber,of <br />El <br />Analysis of Project; Changes:. <br />a) The Project site is located within the South Coast Air Basiii.(Basin) which is under the . <br />, MananemeatDistriol (SGAQiv@).'SC'AQpiIJ) and.lhc <br />JUN LLLG 1 lL �U A,.. <br />Plan (AQMP): The.main purpose.of an,AQ1viP is.to describe air, pollution control strategics io be <br />taken -by -a city; county, orrcgiolrclassifieci'as a nonattniinmentarea in order to bring the area into <br />compliance with federal and Stnte air quality standards. A •nonattainmenl area is considered to <br />have air quality worse than the National Ambient Air Quality Standards (NAAQS) as defined hi <br />[he federal,Clean Atr Act The Basin i4 (h'nonattainment for.the federal and State standards for <br />ozone (Qa) and pi mgulate matter" less than 2.6 micrtins lit diameter (PMS) and in nonattainment <br />for Lhe,Statestandard e6r particuiafemattzr:less Than 10 microns in.dianieter (PMio)-ThnBasin is <br />in attaintnent(maintepaticeLunclassi lscd status for all other federal and State cntgria`pollutant <br />standard's.. <br />Consistency with the 2016 AQMP Tor. the Basin (2016 AQ�1P).mgans that a' Projcet would lie <br />consistent. With Ih"c goals, objeetives, and assumptions in the respective plagtti achieve the federal <br />ar d State air quality standards: Per:lhe SCAQMD CEQA Air Qualrly Handbook (April 1993)i <br />there are hvo"main'i - icators b a project's consistency with the applicable AQh�mp: (1) whether <br />the project would increase the frequency orseverity of existing air quality violations, cause or <br />contribute to now violations, or delay timely attainment of air quality standards or the interim <br />emission reductions snecifred in tl e 2012 AQ,\1P; and (2) whether the project would exceed the <br />2016 AQ1A1i's assumptions for 2030 or yearly incrementsbased on the year of project build out <br />and phasing. For the Revised Project to be consistent with the AQMP adopted by the SCAQMI), <br />the project,,irould need to be eons stent with the projections of employment and population <br />forecasts identifrcd in the 2016 AQMP The Revised Project would add 42 single, family <br />residential units which weren't previously envisioned for.'the project s«e; however the overall <br />population grnwth associated 11 with'the project would be consistent with, the overall growth <br />pmjectiolis for the region contitined in the AQMP_ Therefore, similar to the t\pproved Project, the, <br />Revised Project would also not be inconsistent, with the AQ4V1P allainnteut forecasts The <br />1•:'si10114}M1lAddnictum4Cdd.•ndum.ducx i9:'t1?11'x <br />75B-65 <br />2-16: <br />