My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - CDA WORK CENTER OFFICE SPACE LEASE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/03/2017
>
25B - AGMT - CDA WORK CENTER OFFICE SPACE LEASE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2017 4:59:11 PM
Creation date
9/28/2017 4:49:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
25B
Date
10/3/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Within a reasonable time prior to the start of any on-site work, delivery of materials, equipment, or personnel, Contractor will submit to <br />Owner the following: <br />A- A complete set of drawings approved by Owner and subsequently by the City in which the Building is located. <br />B- A fully executed Indemnity Agreement (To Be Provided by Owner Upon Request), <br />C- Certificate of Insurance in a form approved by Owner executed by insurance companies acceptable to Owner. <br />D- A fully executed Notification -Rules for Contractors (To Be Provided by Owner Upon Request). <br />E- A job schedule of the work to be accomplished, detailed by trade. <br />F- A complete list of all proposed Subcontractors and suppliers. Owner must approve all contractors and subcontractors before <br />commencement of their work. <br />G- The name and phone number (including emergency phone numbers) of personnel who are authorized to represent the Contractor. <br />3. No revisions or changes of any kind may be made to the construction plans previously approved by Owner without prior written consent of <br />the Owner. Any proposed revisions or changes must be submitted to Owner in the form of a change order, for Owner's review and <br />approval prior to commencement of such changes. Revisions or changes altering the floor plan, base building systems, or building <br />operations must be submitted, in writing, to the Owner for review and approval prior to commencement of work. <br />4. All of Contractor's work must be scheduled so that it in no way conflicts with, interferes with, or impedes the quiet and peaceful enjoyment <br />of other tenants or occupants of the Project, or with the progress of Owner's work or operations. Any work that is in conflict will be <br />rescheduled by the Contractor to such time as approved by Owner. Additionally, Owner shall have no liability for any costs or expenses <br />incurred by Contractor (or Tenant) in connection with such rescheduling. <br />5. Contractor and subcontractors shall employ persons and means for the orderly progress of the work without interruption on account of <br />- strikes, work stoppages or similar causes of delay.- Additionally, Owner shall have no liability for any costs or expenses incurred by <br />Contractor (or Tenant) in connection with such delays, <br />6. Materials and tool storage will be limited to the areas for which access has been granted. <br />7. Clean-up and rubbish removal shall be provided by the Contractor at Contractor's expense. Contractor must, on a daily basis, remove all <br />rubbish, surplus and waste material resulting from the performance of his work. At the request of Owner, Contractor shall relocate any <br />materials causing an obstruction as directed by Owner. Contractor will not be allowed to place a dumpster on site on a continuous basis <br />during construction. <br />Important note: The placement and location of rubbish dumpsters and bins must be approved in advance by Owner. <br />8. In general, Owner will interface with Contractor to the extent necessary for work to be completed within the guidelines of project <br />specifications and for the enforcement of building rules and regulations. <br />9. Contractor will make arrangements for unloading, trash removal and hoisting after normal working hours due to the local city noise <br />ordinance. (No such activity will be allowed between the hours of 10:00 p.m. to 7:00 a,m.) At no time will the Contractor be given <br />exclusive reserved use of the freight elevator unless applied for by Contractor and approved by Owner. Contractor maybe afforded access <br />to loading dock space and hoisting facilities for limited use at such time during normal working hours as is prearranged with Owner, or at <br />other times, with the consent of Owner and upon payment of Owner's prevailing fee for after-hours use and access. <br />10. Contractor will be afforded unloading areas as prearranged with Owner. All materials unloaded at these areas will be moved to an area of <br />use immediately and shall not be stored or used in a way which adversely impacts use of the Building. <br />it. Contractor (and Tenant) will be responsible for the security of its own materials, equipment and work, and that of his subcontractors. <br />Contractor will also be responsible for damage caused by Contractor or its subcontractors to the Project, Building and/or tenant areas, <br />including, but not limited to the loading dock and indoor and outdoor public areas, freight elevators, etc. Any such damages will be <br />promptly repaired to the Owner's satisfaction at sole cost of Contractor. <br />12. Contractor will comply with all applicable codes, laws and regulations pertaining to the work of Contractor, including all safety and health <br />regulations. The Contractor shall supply the Owner with a Master List of all Hazardous Materials and their Material Safety Data Sheets <br />(MSDS) upon delivery to thujob site. A discussion will then came pertaining to the safe storage, handling and use of these materials, as <br />well as the Contractor's emergency preparedness plan for handling the containment and clean-up of potential Hazardous Material spills. <br />13. Contractor will not engage in any labor practice that may delay or otherwise impact the work of Owner or any other contractor. <br />14. No base building systems will be turned off or disengaged by Contractor or any subcontractor without prior written approval and <br />supervision by a representative of Owner or its agent. Said systems include but are not limited to sprinklers, electrical circuits, air -handling <br />units, smoke heads and water supply. Building electrical power shut -downs are allowed, with the prior written consent of Owner, on <br />Saturdays between 10:00 p.m. and 5:00 a.m. only. A request for approval shall be made to the Property Manager at least ten (10) days in <br />advance. <br />801 S'Civic Center Dr—City ofSanfa Ana Lease -4- Exhibit D <br />25B-40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.