My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA - CONTRACT TO AMERICAN ASPHALT FAIRVIEW MAINTENANCE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/03/2017
>
20A - AA - CONTRACT TO AMERICAN ASPHALT FAIRVIEW MAINTENANCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2017 5:52:46 PM
Creation date
9/28/2017 5:39:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
10/3/2017
Destruction Year
2022
Document Relationships
ALL AMERICAN ASPHALT (16)
(Related to)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA Project No.: 17.6881 <br />By: Mindy Ly Date Revised: 08/24/17 <br />COST ESTIMATE (CITY OF SANTA ANA JURISDICTION) <br />FAIRVIEW STREET PREVENTATIVE MAINTENANCE <br />FROM SEGERSTROM TO NORTH CITY LIMIT <br />: NO. <br />DESCRIPTION <br />UNIT <br />. UANTITY <br />7âi PRICE. <br />COST <br />1 <br />Unclassified <br />CY <br />70 <br />$33.00 <br />$ 2,310.00 <br />2 <br />3 <br />4 <br />REAS Type 2 <br />ARIIM <br />Cold Mill (2") <br />TN <br />TN <br />SF <br />1,055 <br />3,140 <br />244,900 <br />$577.00 <br />$96.00 <br />$0.25 <br />$ 608,735.00 <br />$ 301,440.00 <br />$ 61,225.00 <br />5 <br />Crack Sealing <br />LS <br />0.970 <br />$57,300.00 <br />$ 55,592.00 <br />6 <br />Remove and Replace PCC Curb Ramp <br />SF <br />10,300 <br />$14.85 <br />$ 152,955.00 <br />7 <br />Remove and Replace PCC Sidewalk <br />SF <br />1,500 <br />$10.74 <br />$ 16,110.00 <br />8 <br />Adjust Manhole Frame & Cover to Finished Grade <br />EA <br />2 <br />$775.00 <br />$ 1,550.00 <br />9 <br />Furnish and Install New Water Valve Frame & <br />Cover to Finished Grade <br />EA <br />6 <br />$877.00 <br />$ 5,262.00 <br />10 <br />11 <br />Furnish and Install new Pull Box #6 Frame and <br />Cover & Adjust to Grade <br />Protection of Surface Utility Frames and Covers <br />EA <br />LS <br />2 <br />1 <br />$2,600.00 <br />$ 5,200.00 <br />âTâ 1,032.00 <br />12 <br />Traffic Loos Type E <br />EA <br />60 <br />$268.00 <br />$ 16,080.00 <br />13 <br />Traffic Loops Type D <br />EA <br />22 <br />$279.00 <br />$ 6,138.00 <br />14 <br />Temporary Construction Sin <br />EA <br />4 <br />$1,200.00 <br />$ 4,800.00 <br />15 <br />Si nin and Stri ing <br />LS <br />0.970 <br />$99,300.00 <br />$ 96,339.00 <br />tl TOTAL CONSTRUCTION COST <br />$ 1,334,768.00 <br />KADe9ignl_PmjeclsXAcW91A19rla1 lmpmwmentslArtenal Street Slurry Seal(1from Segerstmm to NCL July 2017 ML Ravi Santa <br />Ana Jurisdiction only4Sanla Ana Cost 8/24/2017 <br />20A-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.