Laserfiche WebLink
CITY OF SANTA ANA Project No.: 17-6881 <br />By: Mindy Ly Date Revised: 08/24/17 <br />COST ESTIMATE (CITY OF GARDEN GROVE JURISDICTION) <br />FAIRVIEW STREET PREVENTATIVE MAINTENANCE <br />FROM 200' N/O EDNA DRIVE TO SR -22 OFF RAMP <br />NO. <br />DESCRIPTIONS <br />UNIT <br />UANTITY <br />UNITPRICE <br />COST <br />1 <br />Unclassified Excavation <br />CY <br />30 <br />$ <br />33.00 <br />$ <br />990.00 <br />2 <br />REAS Type 2 <br />TN <br />45 <br />$ <br />577.00 <br />$ <br />25,965.00 <br />3 <br />Asphalt Rubber Hot Mix ARHM)* <br />TN <br />60 <br />$ <br />96.00 <br />$ <br />5,760.00 <br />4 <br />Cold Mill (2")* <br />SF <br />0 <br />$ <br />0.25 <br />$ <br />5 <br />Crack Scaling <br />LS <br />0.030 <br />$ <br />57,300.00 <br />$ <br />1,708.00 <br />6 <br />PCC Curb Ram (@ Avalon Ave & Downie) <br />SF <br />900 <br />$ <br />14.85 <br />$ <br />13,365.00 <br />7 <br />Remove and Replace PCC Sidewalk* <br />SF <br />0 <br />$ <br />10.74 <br />$ <br />- <br />8 <br />Adjust Manhole Frame & Cover to Finished Grade <br />EA <br />0 <br />$ <br />775.00 <br />$ <br />9 <br />Furnish/Install New Wv Frame & Cover to Finished Grade <br />EA <br />0 <br />$ <br />877.00 <br />$ <br />- <br />10 <br />Furnish/Install new PB #6 Frame/Cover & Adjust to Grade <br />EA <br />0 <br />$ <br />2,600.00 <br />$ <br />- <br />1 I <br />Protection of Surface Utility Frames and Covers <br />LS <br />0 <br />$ <br />1,032.00 <br />$ <br />- <br />12 <br />Traffic Loops Type E <br />EA <br />0 <br />$ <br />268.00 <br />$ <br />13 <br />Traffic Loops Type D <br />EA <br />0 <br />$ <br />279.00 <br />$ <br />- <br />14 <br />Temporary Construction Sign <br />EA <br />0 <br />$ <br />1,200.00 <br />$ <br />15 <br />Striping (incl udin sandblasting of exist.) <br />LS <br />0.030 <br />$ <br />99,300.00 <br />$ <br />2,961.00 <br />TOTAL CONSTRUCTION COST <br />$ <br />50;749.00 <br />Design Engineering <br />Contingency <br />Construction Engineering <br />0% <br />10% <br />15% <br />$ <br />$ <br />$ <br />5,000.00 <br />8,000.00 <br />- <br />-TOTALPROJECTCOST <br />r$ <br />63,700.00 <br />Note: 1. Assume no work along the westerly shoulder between Glendon and SR -22 off -ramp (severe pavement deterioration) <br />Note: 2. Found ?-Major angular cracks In front of 13072 Fairview NB; 2 -major cracks In front of SR -22 off -ramp S/B; and major cracks <br />In lane #21n front of 13111 Fairview SB <br />K'.1Dealgnl_ProJaM\ArUvaW4erla1 ImprovemenlsWlerial Street Slurry Seel (17-6881)lDxumenls EsgmatesTaIrvim from Segeratrom to NCL Esllmeta fw Garden Grove Judsdicam <br />- Revi 20170602VGarden Grovo Cost 8/25/2017 <br />20A-13 <br />