My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20C - AA - WKE FAIRVIEW BRIDGE PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/03/2017
>
20C - AA - WKE FAIRVIEW BRIDGE PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2017 6:13:23 PM
Creation date
9/28/2017 5:39:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20C
Date
10/3/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement with WKE, Inc., for Design of Fairview Street Bridge <br />October 3, 2017 <br />Page 2 <br />into a Highway Bridge Rehabilitation & Replacement Program (HBRR) grant for a new bridge, <br />including full amenities for bicyclists and pedestrians. Bridge improvements include the widening <br />of Fairview Street between 9th Street and 16th Street, and widening the bridge from a 4 -lane <br />roadway to a 6 -lane arterial. The scope of work also includes a raised median, curbs, bike lanes, <br />sidewalks, and aesthetic enhancements consisting of decorative barrier rails, and roadway <br />lighting. Completion of these improvements will result in adequate vehicular capacity within the <br />City's northern limits (Exhibit 1). <br />The new HBRR grant was approved in May 2017. Subsequently, Caltrans closed out the prior <br />NHPP grant, and the work and expenditures made to -date were credited by the prior grant <br />without impact on the new grant. HBRR grant funds in the amount of $1,604,805 have been <br />recognized in the approved FY 2017-18 Capital Improvement Program and are fully available for <br />the new bridge replacement project. <br />On June 29, 2017, the Public Works Agency released a Request for Proposals (RFP) to qualified <br />firms to provide engineering design services for the Fairview Bridge Replacement and <br />Improvement Project. The RFP was also posted on the City website. Three proposals were <br />received and evaluated by a review committee from the Public Works Agency. Each proposal <br />was rated according to the proposer's qualifications, experience, capacity to perform the required <br />work, and pricing data. The following is a summary of the firms and their respective scores: <br />NAME OF FIRM RANKING <br />WKE, Inc. <br />93 <br />TY -LIN International 88 <br />CNS Engineers, Inc. 77 <br />Based on the ranking and fee analysis, staff recommends that WKE, Inc., be retained to perform <br />the required design engineering services. The agreement (Exhibit 2) includes a detailed scope of <br />work and a schedule of rates and fees for a proposed fee of $1,424,154. In addition, staff <br />requests authorization of a ten (10) percent design services contingency in the amount of <br />$142,415, which results in the total not -to -exceed contract amount of $1,566,569. <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this item supports the City's efforts to meet Goal #6 — Community Facilities & <br />Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City <br />assets), Strategy G (develop and implement the City's Capital Improvement Program in <br />coordination with the Community Investment and Deferred Maintenance Plans). <br />ENVIRONMENTAL IMPACT <br />There is no environmental impact associated with this action. <br />20Ci-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.