My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE - 50A
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/03/2017
>
CORRESPONDENCE - 50A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 9:29:15 AM
Creation date
10/3/2017 12:20:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda
Item #
50A
Date
10/3/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Executive <br />however, the alignment for the entire Great Park Boulevard West is yet to be completed <br />and finalized. The alignment of the said roadway shown on the exhibits in this FIR reflects <br />the expected intersection location at the time the NOP was issued. At the time of Project <br />development, minor modifications to the Project would be required to reflect the final <br />roadway alignment, including, but not limited to, minor modifications to Planning Areas <br />1 through 13 to reflect the final location of Marine Way. Also, it is anticipated that the <br />change to the Great Park Boulevard West/Marine Way intersection (if the proposed <br />November 2015 alignment is implemented) might require the other changes to the <br />proposed Project access points from Marine Way. It is not anticipated that this should <br />result in a substantial modification to the findings in this EIR; however, this would be <br />determined as part of the Level 1, II or III review when development is proposed. It should <br />be noted, that Development Requirement (DR) TRAN-8 (in Section 4.14.7) requires <br />individual development projects under the Development Plan that connect with external <br />roadways be evaluated for consistency with applicable design requirements outlined in <br />the City of Irvine Transportation Design Procedures or County of Orange equivalency. <br />This measure would ensure there would be adequate intersection spacing even with the <br />relocation of the Great Park Boulevard West/Marine Way intersection. <br />• The Project site is located on the former MCAS El Toro, which had been ]mown to use and <br />store chemicals and jet fuels. The base is included on the Cortese List compiled pursuant <br />to Section 65962.5 of the California Government Code. Due to the potential site and <br />groundwater contamination, approximately 41.64 acres of the Project site has not yet <br />been found suitable for transfer. Therefore, this portion of the site remains under fee <br />ownership by the DoN and is subject to a LIFOC between the DoN and Heritage Fields, <br />with a sublease to the County. Once remediated, the DoN will make a FOST, allowing the <br />transfer of the remainder of the Property in fee to Heritage Fields LLC. Subsequently, that <br />portion of the Property would be transferred to the City, and then to the County, as <br />required by the Pre -Annexation Agreement. The precise timing of the transfer is not <br />known at this time. Should there be unforeseen delays in the transfer of the property, the <br />phasing of the Project development may be influenced because the County would not <br />have fee title to the property. As shown in Exhibit 2-3, the LIFOC area is generally located <br />southeast of the Bee Canyon Channel and in the southern portion of the Project site. This <br />delay should not influence the CEQA document. <br />• The Pre -Annexation Agreement provides for the transfer of a contiguous 100 -Acre parcel <br />to the County for development. The location of the parcel was identified in the Pre - <br />Annexation Agreement but the precise boundaries of the parcel had not been established. <br />The final alignment of Marine Way is required before this can occur because minor <br />variants in the roadway alignment would result in changes to the size and configuration <br />of the County property west and southwest of Marine Way. This process, known as the <br />"true -up" is memorialized in Implementation Agreement #2 between the County and the <br />City and will be completed once the final Marine Way alignment is established. Minor <br />changes to the Property boundary are anticipated as part of the true -up process. <br />Although the alignment west of the Great Park Boulevard West was finalized in <br />November 2015, as indicated above, the alignment east of the Great Park Boulevard West <br />is yet to be completed and finalized. It is not anticipated that the true -up process would <br />result in a substantial modification to the findings in this FIR because the anticipated <br />property line adjustments would be very minor; however, this would be determined at <br />the time the final true -up is completed. <br />1-10 EL TORO, 100 -ACRE PARCEL DEVELOPMENT PLAN <br />PROGRAM ENVIRONMENTAL IMPACT REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.