My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH COMMERCIAL CANNIBIS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/17/2017
>
75B - PH COMMERCIAL CANNIBIS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2017 8:21:47 PM
Creation date
10/12/2017 8:12:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
10/17/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in compliance with the application requirements in Phase 1 shall be placed on <br />the "RSP Eligibility List" and shall be notified in writing whether they are a "RSP <br />Eligible Applicant" or not. Each applicant on the RSP Eligibility List may then <br />choose to file an application for a RSP in Phase 2. <br />c. The requirements for Phase 1 include but are not limited to: <br />i. All application documents required in the City s Phase 1 Registration <br />Application package. <br />ii. Application was submitted during the application period. <br />iii. Application forms are filled out completely. <br />iv. Business Owner(s)/Applicant(s) referenced on the application provides <br />a Live Scan that was conducted within 14 days prior to submitting the <br />application. <br />V. Phase 1 application fee is paid. <br />vi. A signed statement that the proposed location of the commercial <br />cannabis business on the application meets the zoning criteria <br />established in this article including, but not limited to, any and all <br />sensitive use separation criteria required by this article. <br />d. The Director of Planning and Building or designee(s) shall determine whether <br />each application demonstrates compliance with the minimum requirements <br />(above) and be placed on the RSP Eligibility List and entered into the Phase 2 <br />application and review process. <br />e. The Director of Planning and Building or designee(s) shall review each <br />application upon submission and ensure that the application is complete. <br />Incomplete applications will be promptly rejected and the applicant shall be <br />notified in writing of the deficiencies. The applicant shall be given an opportunity <br />to cure any incomplete or deficient application prior to the conclusion of the <br />application processing term, if such time period is applicable. <br />3. Phase 2 - Regulatory Safety Permit Application <br />a. Each applicant identified on the RSP Eligibility List may choose to complete and <br />file a RSP application to the Director of Planning and Building. The application <br />shall be filed together with a nonrefundable fee as established by resolution of <br />the City Council, to defray the cost of investigation required by this article. <br />b. The RSP application period shall be open for thirty (30) calendar days and may <br />run concurrently with the Phase 1 review period. Following the RSP application <br />Ordinance No. NS -XXX <br />Page 21 of 27 <br />75B-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.