Laserfiche WebLink
Proposal for <br />Santa Ana Main Street <br />Corridor Improvements <br />Z. - <br />Task <br />Task 3: Geotechnical Study <br />Infiltration Test and Soil Suitability: Our team will conduct a geotechnical field review as follows: <br />Percolation rate test at four locations within the proposed bulb -out areas; and Agronomy/soil fertility <br />laboratory testing encompassing major element fertility package, agricultural suitability package, and <br />USDA particle size analysis <br />We will compile data and geotechnical analysis of the field and laboratory tests consisting of analyses to <br />evaluate and provide recommendations pertaining to the following: <br />Percolation rate characteristics of the soils, Atterberg Limits/Plasticity Index, moisture and density, <br />suitability of the on-site soils for landscape improvements, foundation design criteria for new monuments <br />or signs <br />We will prepare a report presenting the results of field exploration, geotechnical laboratory testing, <br />engineering analyses, conclusions and recommendations relative to the project. <br />Pavement Evaluation: We will provide the following services: <br />• Subsurface exploration consisting of the excavation, sampling, and logging of eight hand excavated <br />cores to depths of approximately 3 feet or refusal within the project limits. The purpose of the pavement <br />borings will be to observe the existing structural pavement sections and collect soil samples for <br />geotechnical laboratory testing. <br />Our team will compile data and geotechnical analysis of the field and laboratory tests with analyses to <br />evaluate and provide recommendations pertaining to the following: <br />• Evaluate the R -value and in-place moisture content of subsurface soils. <br />• Excavation and compaction requirements, including suitability of the on-site soils for subgrade material <br />for the proposed improvements. <br />• Analysis and design of new pavement construction and pavement rehabilitation alternatives within <br />the proposed bike path areas. The analysis will be performed in general accordance with the Caltrans <br />Highway Design Manual design method. <br />We assume that the 10- and 20 -year design traffic indices (TI) for the subject streets will be provided to us <br />by the City for our analyses. <br />Deliverables: Draft Pavement and Soil Material Report, Final Pavement Report and Soil Material Report <br />Task 4: Record Research and Utility Coordination <br />Kimley-Horn will obtain readily available record drawings and data pertinent to the scope of services such <br />as record drawings, GIS mapping, and utility atlases. We will initiate the utility company notification process <br />early in the design process and identify potential conflicts. We will maintain a utility agency tracking list to <br />indicate the status of communication and add a contact list for substructure and utility owner -operators for <br />the specifications. We will assist the City with a utility notification letter consisting of the following: <br />1. Utility Information Request <br />2. Prepare to Relocate Notice/Final Utility Notice Form <br />3. Notice to Relocate <br />Kimley»)Horn 12 TR8077004.17I City of Santa Ana <br />