My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY HORN - 2017
Clerk
>
Contracts / Agreements
>
K
>
KIMLEY HORN - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2017 4:32:15 PM
Creation date
10/17/2017 4:30:02 PM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY HORN
Contract #
A-2017-273
Agency
PUBLIC WORKS
Council Approval Date
8/1/2017
Expiration Date
8/1/2019
Insurance Exp Date
1/1/1900
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`s - <br />E H.IBIT A <br />Proposal for <br />Santa Ana Main Street <br />Corridor Improvements <br />Solution: Community engagement at various points during the project allow participants to continue <br />to have a voice in the design and the process. The Kimley-Horn team will work with the City staff on <br />community engagement activities and bilingual communications to gather meaningful feedback on the <br />design development. Audiences we anticipate for public meetings may include the City of Santa Ana <br />Merchant Association, Neighborhood Associations, business owners, residents, and developers as well as <br />City staff and elected officials. <br />Scope of Services <br />The tasks below are intended to supplement and clarify the scope items in the RFP, to demonstrate phases <br />of our services, tasks, and deliverables to be completed. Additional items that may be required to complete <br />the scope of services are described at the end of the matrix under the heading Optional Items. Design <br />plans and reports indicated will follow the City's standard format unless indicated otherwise. A drawing list <br />indicating anticipated sheet count is included with our fee in the separate sealed envelope. We assume a <br />twelve-month schedule for design beginning May 2017 with design services completed by May 2018. Our <br />proposed schedule is provided at the end of this section. <br />cask 1: <br />Project Coordination and Meetings <br />The Kimley-Horn Team will meet with City staff and other <br />relevant stakeholders to understand the City's goals for the <br />design elements. This encompasses review and comments in <br />response to the City staffs ideas. We will conduct meetings <br />and conference calls, and provide pertinent meeting minutes <br />with action items, This also includes phone and email <br />communications. The following meetings are included in our <br />scope: One Kickoff Meeting and 12 Monthly Project Design <br />Team Meetings <br />Deliverables: Meeting agendas, meeting minutes, action items <br />Task 2: Survey <br />The Kimley-Horn team will provide aerial mapping with supplemental ground surveys at a scale of 1" <br />= 20' with 100 feet Interval cross sections for Main Street from Warner Avenue to 1st Street. Ground <br />surveys will be used for the areas where more detail is needed for the design of the proposed bulb -outs <br />and curb returns as shown in the RFP exhibits. This includes survey record collection, establishment of <br />horizontal and vertical controls, monument and centerline tie preservation, and establishment of temporary <br />benchmarks. Existing features such as utility covers, pavement limits, private property improvements, curb <br />ramps, driveways, curb and gutters, sidewalks, street lights and poles, and traffic signs and striping will be <br />surveyed where needed for the proposed design and added to the base maps. Existing right-of-way will be <br />inputted per readily available records. <br />Deliverables: Microstation V81 Files of Topographic Survey, XML Point File, DTM of existing surface <br />features <br />City of Santa Ana I TRRD77004.17 <br />Kimley>»Horn <br />
The URL can be used to link to this page
Your browser does not support the video tag.