My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY HORN (2) - 2017
Clerk
>
Contracts / Agreements
>
K
>
KIMLEY HORN (2) - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 12:18:11 PM
Creation date
10/17/2017 4:30:02 PM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY HORN
Contract #
A-2017-273-01
Agency
Public Works
Council Approval Date
8/1/2017
Expiration Date
8/1/2019
Insurance Exp Date
4/1/2020
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 13,2017 <br />making design changes determined necessaryto address clarifications, Other design changes, such as those <br />for the contractor's preference, are not included in this scope. Changes In the overall design concept are not <br />accounted for in this scope. <br />Deliverables: Responses to three RFIs; Design Revision for one Addendum <br />Construction Phase <br />Kimley-Horn will assist the City during the construction phase by responding to the contractor's RPIs, <br />preparing addenda, and providing clarifications. This also consists of reviewing the contractors change orders <br />and changed conditions in the field. Changes in the overall design are not part of this scope. An 8-month <br />construction duration is assumed. We have included up to two meetings, up to 10 RFIs, up to 10 contractor <br />submittal reviews, up to two field observations, and up to two addenda. We will prepare record drawings by <br />updating the approved design drawings based on one set of redline markups provided by the contractor or <br />City staff. Independent verification is not included in this scope. Significant deviations from the original design <br />documents are not accounted for In this scope. The purpose of the record drawings is to create a deliverable <br />that will represent the built condition for the City's records as recorded by the Contractor. <br />Deliverables: Record Drawings; One hardcopy and one electronic (both PDF format and Microstation V8l) <br />
The URL can be used to link to this page
Your browser does not support the video tag.