Laserfiche WebLink
CITY OF SANTA ANA Project No,: 17-6881 <br /> By: Mindy Ly Date Revised: 08/24/17 <br /> COST ESTIMATE(CITY OF SANTA ANA JURISDICTION) <br /> FAIRVIEW STREET PREVENTATIVE MAINTENANCE <br /> FROM SEGERSTROM TO NORTH CITY LIMLI <br /> Nb.:,: DESC-R F'TION' UNIT` QVANTITYU,N'L'I"%RM. ''"'''I:70M:CY:',-:' <br /> :' <br /> 1 Unclassified CY 70 $33.00 $ 2,310,00 <br /> 2 REAS Type 2 TN 1,055 $577.00 $ 608,735,00 <br /> 3 AREM TN 3,140 $96.00 $ 301,440.00 <br /> 4 Cold Mill(2") SF 244,900 $0,25 $ 61,225,00 <br /> 5 Crack Sealing LS 0.970 $57,300.00 $ 55,592,00 <br /> 6 Remove and Replace PCC Curb Ramp SF 10,300 $14.85 $ 152,955.00 <br /> 7 Remove and Replace PCC Sidewalk SF 1,500 $10.74 $ 16,110.00 <br /> 8 Adjust Manhole Frame&Cover to Finished Grade EA 2 $775.00 $ 1,550,00 <br /> Furnish and Install New Water Valve Frame& <br /> 9 Cover to Finished Grade EA 6 $877.00 $ 5,262.00 <br /> Furnish and Install new Pull Box#6 Frame and <br /> 10 Cover&Adjust to Grade EA 2 $2,600.00 $ 5,200.00 <br /> 11 Protection of Surface Utility Frames and.Covers LS 1 $1,032.00 $ 1,032.00 <br /> 12 Traffic Loops Type E EA 60 $268.00 $ 16,080,00 <br /> 13 Traffic Loops Type D EA 22 $279.00 $ 6,138,00 <br /> 14 Temporary Construction Sign EA 4 $1,200.00 $ 4,800.00 <br /> 15 Signing and Striping LS 0.970 $99,300.00 $ 96,339.00 <br /> TOTAL CONSTRUCTION cost - $ 1,334,768.00 <br /> K:\Design\_Frojecls\Active\Arterial Improvements\Arierial Street Slurry Seal(17-6881)\Documents\Estlmales1Pairview from Segerstrom to NCL July 2017 ML Ravi Santa <br /> Ana Jurisdiction only\Santa Ma Cost 8/24/2017 <br />