My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GARDEN GROVE, CITY OF (2) - 2017
Clerk
>
Contracts / Agreements
>
G
>
GARDEN GROVE, CITY OF (2) - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2017 10:03:34 AM
Creation date
10/30/2017 10:03:33 AM
Metadata
Fields
Template:
Contracts
Company Name
GARDEN GROVE, CITY OF
Contract #
A-2017-259
Agency
Public Works
Council Approval Date
10/3/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA Project No.: 17-6881 <br /> By: Mindy Ly Date Revised: 08/24/17 <br /> COST ESTIMATE(CITY OF GARDEN GROVE JURISDICTION) <br /> FAIRVIEW STREET PREVENTATIVE MAINTENANCE <br /> FROM 200'N/O EDNA DRIVE TO SR-22 OFF RAMP <br /> NOr _ DESCRIPTION ,^Ert IT-QUANTITY UNIT NOC+& DOST : <br /> 1 Unclassified Excavation CY 30 $ 33.00 $ 990,00 <br /> 2 REAS Type 2 TN 45 $ 577.00 $ 25,965,00 <br /> 3 j Asphalt Rubber Hot Mix(ARHM)* TN 60 $ 96.00 $ 5,760.00 <br /> 4 j Cold Mill(2")* SF 0 $ 0.25 $ - <br /> 5 Crack Sealing LS 0.030 $ 57,300,00 $ 1,708.00 <br /> 6 PCC Curb Ramp(@ Avalon Ave&Downie) SF 900 $ 14.85 $ 13,365.00 <br /> 7 Remove and Replace PCC Sidewalk* SF 0 $ 10.74 $ <br /> 8 Adjust Manhole Frame&Cover to Finished Grade EA 0 $ 775.00 $ - <br /> 9 Furnishllnstall New Wv Frame&Cover to Finished Grade EA 0 $ 877.00 $ <br /> 10 Furnish/Install new PB#6 Frame/Cover&Adjust to Grade EA 0 j $ 2,600.00 $ - <br /> 11 Protection of Surface Utility Frames and Covers LS 0 $ 1,032.00 $ - <br /> 12 Traffic Loops Type E EA 0 $ 268,00 $ - <br /> 13 Traffic Loops Type D EA 0 $ 279.00 $ - <br /> 14 Temporary Construction Sign EA 0 $ 1,200.00 . $ - <br /> 15 Striping(including sandblasting of exist.) LS 0.030 $ 99,300.00 $ 2,961.00 <br /> TOTAL CONSTRUCTION COST $ , _,50,`749.001 <br /> Design Engineering 0% $ - <br /> Contingency 10% $ 5,000,00 . <br /> Construction Engineering 15% $ 8,000:00 <br /> ;IOTA ERQc1IGP"I Cos `., '. $ 63,700.00' <br /> Note:1.Assume no work along the westerly shoulder between Glendon and SR-22 off-ramp(severe pavement deterioration) <br /> Note:2.Found 2-Major aligator cracks In front of 13072 Fairview NIB;2-major cracks in front of SR-22 off-ramp MI;and major cracks <br /> In lane 82 in front of 13111 Fairview S/B <br /> K:oeslgn\_Projeclsv\ctivav rierial ImprovemenlslArterial Street Slurry Seal(17-68815Documents\Estimales\Felrview from Segerstrom to NCL Estimate for Garden Grove Junsdiciiol <br /> -Revt 201708021Garden Grove Cost 8/25/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.