My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25P - AGMT TRAFFIC BARRICADES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
12/05/2017
>
25P - AGMT TRAFFIC BARRICADES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2017 5:32:00 PM
Creation date
11/30/2017 7:30:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25P
Date
12/5/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRST AMENDMENT TO AGREEMENT WITH CALIFORNIA BARRICADE RENTALS <br />FOR PROVISION. INSTALLATION. AND REMOVAL OF TRAFFIC BARRICADES <br />THIS FIRST AMENDMENT to the above -referenced agreement is entered into on December 5, 2017 by <br />and between California Barricade Rentals, Inc. ("Contractor"), and the City of Santa Ana, a charter city <br />and municipal corporation organized and existing under the Constitution and laws of the State of <br />California ("City"). <br />RECITALS <br />A. The parties entered into Agreement #A-2017-057, dated March 21, 2017 ("Agreement"), by which <br />Contractor agreed to provide traffic barricade equipment to the Parks, Recreation, and Community <br />Services Agency for various City -hosted events. <br />B. The Agreement remains in effect through December 31, 2017, and may be extended for an additional <br />two years. The maximum amount to be expended through December 31, 2017 is $70,000. The <br />maximum amount to be expended for each additional year is also $70,000. <br />C. Under the Agreement, the City may request additional equipment or services during the term of the <br />Agreement. Such equipment and services have been utilized by the Public Works Agency for the <br />provision of traffic control equipment at the First Street Bridge, as a result of testing and repairs being <br />made to the bridge. <br />D. The Agreement remains in effect, and the parties now wish to amend the Agreement by expanding the <br />scope of services to allow the continued provision of equipment to the Public Works Agency to <br />maintain lane closures and ensure traffic safety on the First Street Bridge and to adjust the <br />compensation for the period ending December 31, 2017. <br />The parties therefore agree: <br />1. Section 1, Scope of Services, is amended to include the provision of traffic control equipment to the <br />Public Works Agency to maintain lane closure and ensure traffic safety on the First Street Bridge. <br />2. Section 2, Compensation, is amended to include an additional $50,000 for services to be performed <br />by Contractor through December 31, 2017, so that the total sum to be expended through that date <br />shall not exceed $120,000. <br />3. Section 2, Compensation, is further amended such that the applicable rates and charges for services <br />and equipment provided by Contractor shall be those described in Exhibit A to this First Amendment. <br />Exhibit A shall fully supersede the original Exhibit A included in the Agreement. <br />4. Except as modified by this First Amendment, and all prior amendments, all terms and conditions of <br />the Agreement remain unchanged and in full force and effect. <br />-- signatures appear on following page — <br />Page 1 of 2 <br />ioiv <br />
The URL can be used to link to this page
Your browser does not support the video tag.