Laserfiche WebLink
Exhibit B <br />MS + MEGT Collaborative <br />Landscape Architecture I Urban Design I Planning <br />305 North Coast Hwy Suite T <br />Lacuna Beach CA 92651 , <br />941.375.2523 <br />July 17, 2017 <br />City of Santa Ana <br />Public Works Agency; <br />20 Civic Center Plaza; 3rd Floor Reception, Ross Annex <br />Santa Ana, CA 92701 <br />Attn.: Suzl Furjanic <br />Re: FEE PRPOSAL -Clty of Santa Ana Center Street Urban Greening, RFP 17-012 <br />Dear Ms, Furjanic; <br />MS k MEGT Collaborative (MMC) Is pleased to submit this landscape Architecture services proposal for <br />the above-mentioned project. We have built a reputation on our strength in working with owners, <br />Architects and other consultants and we welcome this opportunity to work with the City of Santa Ana in <br />creating a high-quality project. <br />MMC has provided the following Fee proposal Including Sub -Consultants and potential expenses. MMC <br />reserves the right to use other Sub -consultants upon City's approval, should that deem necessary due to <br />unforeseen circumstances I.e. Deadline commitments due to work overload, Major changes In the <br />company etc. <br />A. Scope of work <br />The Scope of Work Involves removal of approximately 39,000 square feet of asphalt paved street <br />and converting the area to passive landscaped open space. The project, as represented in the concept <br />plan shall Include the following components: <br />1. Street removal and infill <br />2. Grading <br />3, Permeable walkway installation <br />4. Construction of rock blo-swale <br />5. California Friendly landscaping with drought tolerant properties <br />6. Automatic drip Irrigation system <br />7, Site Amenities, Including interpretive signage, benches, picnic tables, bike racks <br />8, Drainage which utilizes "Low Impact Development" concepts with goal for full site Infiltration. <br />Task I: Pre-Design/schematic Design <br />1. Kick off meeting with the client to discuss the project expectation, to discuss scope of work, <br />project, goals and objectives, potential elements, issues, schedule and general character of the <br />enhancements. <br />Page 1 of 4 <br />25R-19 <br />