Laserfiche WebLink
2. Visit the site, Photograph and note the general character of the site and suitable areas for new <br />features. <br />3. Prepare concept pian to Include proposed plan, Images, plant materials, hardscape elements, <br />and Opinion of Probable cast for Landscape. <br />4, Civil Eng, to prepare Survey plan. <br />S. Present Concept plan for review and make revision to the plan per review meeting for approval <br />Deliverables shall include (1) rendered concept plan. <br />Task R: Design Development 50% Plans <br />Based upon the client approved Concept plan, prepare Design Development plans which shall Include <br />landscape architectural and civil engineering, to Include the following: <br />1. Review and Coordinate with civil engineer regarding layout, grading and drainage concepts, <br />2. Prepare hardscape layout design and propose paving material. selection, and landscape lighting. <br />3. Prepare major site elements details. <br />4. Develop site features plan with proposed elements selections. <br />S. Prepare planting pian with detailed plant legend. <br />6. Prepare Civil Erre. plans to Include: site Erosion, Horl2ontal vertical control Pan, LID/WQMP. <br />7. Geotech to commence tests, analysis and report. <br />B. Refine opinion of probable construction cost. <br />9. Draft specifications <br />Deliverables shall include a 50% set of plans, draft specification and "Opinion of Probable Cost' <br />Task III: Construction Documents (90% and 100%) <br />Based upon the client approved design development plans and estimated construction budgets, AR shall <br />prepare construction documents for the project, including the following; <br />1. Title Sheet. <br />2. Complete all Civil Engineering Pans (Site Erosion plan, Horizontal and Vertical Control plans, <br />Grading and Drainage, LiD/WQMP, Hydrology, Specifications) <br />3. Complete all Landscape Construction plans (Hardscape layout ad Details, Planting Plan and <br />Details, Irrigation Plan, Details, and Calculations, Site furnishing Plan and specs.) <br />4. Prepare a site -furnishing plan. <br />5, Site Electrical Plan and Calculations <br />6. Complete CSI format specifications <br />7. Final opinion of probable cost. <br />Technical Specifications <br />Technical specifications for all components listed above shall be provided by Consultant, ortheir Sub - <br />consultants, to the City In CSI (Construction Specifications Institute) format. City Staff will combine these <br />specifications with the City Boller Plate which together, will become the Project Manual. <br />Page 2 of 4 <br />25R-20 <br />