Laserfiche WebLink
CITY OF SANTA ANA: RFP 17 -02 -Center Street Wan Greening AAS+IVIFGFCollaborative <br />Detailed Fee Schedule of the Proposed Costs <br />I. Pre- Design. Concept Plan Package <br />MS <br />$150/hr <br />20 <br />MA <br />$120/hr <br />28 <br />Staff <br />$75/1hr <br />30 <br />12% <br />$. <br />8,610,00 <br />II, Design Development -50% <br />MS <br />$150/hr <br />24 <br />MA <br />$120/hr <br />40 <br />Staff <br />$75/1hr <br />60 <br />18% <br />$ <br />12,900.00 <br />. <br />Itl,Canstructlop.Document+100% <br />MS <br />$150/hr <br />14 <br />MA <br />$120/1hr <br />45 <br />Staff <br />$75/hr <br />80 <br />19% <br />$ <br />13,500,00 <br />IV. Bid AdveetiseNment/Construction <br />MS <br />$150/hr <br />6 <br />Administration%As. Built Plans <br />MA <br />$120/frr <br />14 <br />Staff <br />$75/hr <br />18 <br />12% <br />$ <br />3,930.00 <br />MS+MEOT <br />54% <br />$ <br />38,940.00 <br />Subconsultants and Misc, <br />FR &Associates <br />8% <br />$ <br />6,000 <br />AESOC Eng. <br />12°! <br />$- <br />8,615 <br />Foresight Engineering <br />26% <br />$ <br />19,000 <br />$ <br />33,515.00 <br />LEGEND <br />MA Mar)anehAfkhamf <br />IVIS MonicaSlliipson <br />TOTAL <br />$ <br />32,555.00 <br />Mise, Expenses: <br />$ails Agricuffural test <br />Woo.06 <br />Reprographic': <br />$2,000.00 <br />25R-23 <br />