My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH BRISTOL ST MEMORY LN PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
12/05/2017
>
75A - PH BRISTOL ST MEMORY LN PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2017 5:34:02 PM
Creation date
11/30/2017 7:30:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75A
Date
12/5/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements — Proiect No. 17-6883 <br />3.9 HYDROLOGY AND WATER QUALITY <br />This section corresponds with the following 1990 FEIS/EIR, Section IV, Environmental Consequences and <br />Mitigation Measures, subsections: <br />• Subsection C, Erosion Impacts; <br />• Subsection D, Floodplain/Floodivay Encroachment; and <br />• Subsection F, Water Quality. <br />Would theprojeetr <br />a) Violate any water quality standards or waste discharge requirements? <br />Under Section 402 of the Clean Water Act (CWA), the EPA has established regulations under the NPDES program <br />to control direct storm water discharges. Should 1.0 acre or more of site disturbance occur, those activities would be <br />subject to the NPDES program for the Santa Ana Regional Water Quality Control Board. The proposed Project <br />would only impact approximately 0.39 acres, which is less than the 1.0 -acre threshold. Thus, the Project would not <br />be subject to NPDES requirements, as potential waste discharge would be nominal. Furthermore, the Project would <br />be required to comply with the 1990 FEIS/EIR Mitigation Measure C-2, involving the placement of straw or other <br />suitable materials over uncovered soils, as needed, during street construction activities, further reducing the amount <br />of erosion occurring at the Project site. Regarding operations, the Project would not increase the capacity of the <br />roadway or the number of vehicles using the Project area. Therefore, impacts to water quality would be similar to <br />those identified in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: Refer to 1990 FEIS/EIR Mitigation Measure C-2 <br />Mitigation Measures: No additional mitigation measures are required. <br />b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge <br />such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table <br />level (e.g., the production rate of pre-existing nearby wells would drop to a level that would not <br />support existing land uses or planned uses for which permits have been granted)? <br />The proposed Project would not result in increased water consumption and would not deplete groundwater supplies. <br />No impact to groundwater supplies would result from the proposed Project. Impacts in this regard would not be <br />greater than that previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No additional mitigation measures are required. <br />C) Substantially alter the eeisting drainage pattern of the site or area, including through the alteration <br />of the course of a strewn or river, in a manner that would result in substantial erosion or siltation <br />on- or off-site? <br />The proposed Project would only nominally increase the paved/impervious areas of the Project site. This nominal <br />increase would not result in a substantial increase in erosion or siltation on- or off-site. Further, implementation of <br />1990 FEIS/EIR Mitigation Measure C-2 would reduce any potential erosion/siltation impacts during construction. <br />Thus, impacts in this regard would not be greater than that previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: Refer to 1990 FEIS/EIR Mitigation Measure C-2 <br />Mitigation Measures: No additional mitigation measures are required. <br />Draft I November 2017 3-17 Environmental Consequences <br />75A-46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.