My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH BRISTOL ST MEMORY LN PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
12/05/2017
>
75A - PH BRISTOL ST MEMORY LN PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2017 5:34:02 PM
Creation date
11/30/2017 7:30:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75A
Date
12/5/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements - Project No. 17-6883 <br />d) Substantially alter the existing drainage pattern of the site or area, including through the alteration <br />of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a <br />manner that would result in flooding on- or off-site? <br />Currently, the Project site only includes curb and no catch basin is present. As a result, seasonal ponding does occur <br />along this portion of Bristol Street. The proposed Project would result in a nominal increase in impervious ground <br />surfaces. However, development of the Project would result in the relocation of the existing curb features at the <br />Project site. Thus, implementation of the proposed Project would not result in a substantial increase compared to the <br />existing condition. Further, Project development may include extension of the existing storm water pipeline system <br />(located on the eastern side of Bristol Street) through a new lateral connection and new catch basin at the Project <br />site. These improvements, if constructed, would result in a reduction of existing flooding and would be a beneficial <br />impact. Thus, impacts would not be greater than previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No additional mitigation measures are required. <br />e) Create or contribute runoff water which would exceed the capacity of existing or planned storm <br />water drainage systems or provide substantial additional sources ofpolluted runoff? <br />Refer to Response 3.9(a). Impacts would not be greater than previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No additional mitigation measures are required. <br />f) Otherwise substantially degrade water quality? <br />Refer to Response 3.9(a). Impacts would not be greater than previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No additional mitigation measures are required. <br />9) Place housing within a 100 year flood hazard area as mapped oil a federal Flood Hazard Boundary <br />or Flood Insurance Rate Map or other flood hazard delineation nap? <br />The Project site is located outside of the 100 -year flood zone.14 Further, the proposed Project would not construct <br />any housing. Therefore, no impact would result from the proposed Project in this regard. Impacts would not be <br />greater than previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No additional mitigation measures are required. <br />h) Place within a 100year flood hazard area structures which would impede or redirect flood flows? <br />Refer to Response 3.9(g). Impacts would not be greater than previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No additional mitigation measures are required. <br />14 Federal Emergency Management Agency, FEMA Flood Map Service Center, https://msc.fema.gov/portaUse=h? <br />AddressQuery=memory%201ane%2C%20santa%20ana#seamhresultsmehor, accessed August 3, 2017. <br />Draft I November 2017 3-18 Environmental Consequences <br />75A-47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.