My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH BRISTOL ST MEMORY LN PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
12/05/2017
>
75A - PH BRISTOL ST MEMORY LN PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2017 5:34:02 PM
Creation date
11/30/2017 7:30:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75A
Date
12/5/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bristol Street and <br />ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Lane Intersection Improvements — Project No. 17-6883 <br />Expose people or structures to a significant risk of loss, injury or death involving flooding, <br />including flooding as a result of the failure of a levee or dam? <br />The proposed Project does not involve the construction of new habitable structures or people at the Project site. <br />Therefore, the Project would not expose people or habitable structures to a significant flooding risk beyond that <br />which already exists. Impacts would not be greater than previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No additional mitigation measures are required. <br />j) Inundation by seiche, tsunami, or mudflow? <br />The Project site is located approximately 15 miles inland from the Pacific Ocean; therefore, the likelihood of <br />tsunami impacting the site is minimal. The Project site and vicinity are highly urbanized and there are no nearby <br />water bodies or unusual slopes or geologic features in the area. No impacts involving seiche, tsunami, or mudflow <br />are anticipated. Impacts would not be greater than previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measure: No additional mitigation measures are required. <br />3.10 LAND USE AND PLANNING <br />This section corresponds with the 1990 FEIS/EIR, Section rv, Environmental Consequences and Mitigation <br />Measures, Subsection A, Landform Modification. <br />Would the project: <br />a) Physically divide are established community? <br />The proposed Project involves the widening of the intersection of Bristol Street and Memory Lane; the proposed <br />Project would not divide an established community. Although the proposed widening of Bristol Street within the <br />Project limits would result in partial acquisition of existing properties, the Project would not create a physical barrier <br />to, or separate, a community. Impacts would not be greater than that previously analyzed in the 1990 FEIS/EIK <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No additional mitigation measures are required. <br />b) Conflict with any applicable land use plait, policy, or regulation of an agency with jurisdiction over <br />the project (including, but not limited to the general plan, specific plan, local coastal program, or <br />zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? <br />According to the City of Santa Ana General Plan (General Plan), the Project area is designated General Commercial <br />(GC) and Low Density Residential (LDR-7). The zoning designation of properties within the Project area are <br />Specific Development (SD27) which is developed as the Portofino Apartments and Community Commercial (Cl) <br />which allows for retail and service uses. The proposed Project would not result in changes to the land use <br />designation of the acquired parcels. The proposed Project is in compliance with the existing designations and would <br />not create a new conflict. It is acknowledged that due to building setback requirements, the Project would require <br />approval from the City Manager for landscape strip Exceptions for building setbacks per Municipal Code Section <br />41-781. With City Manager approval, the Project would be consistent with the Municipal Code requirements. No <br />significant impacts would result and impacts would be similar to those identified in the 1990 FEIS/EIR. <br />Draft I November 2017 3-19 Environmental Consequences <br />75A-48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.