My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH BRISTOL ST MEMORY LN PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
12/05/2017
>
75A - PH BRISTOL ST MEMORY LN PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2017 5:34:02 PM
Creation date
11/30/2017 7:30:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75A
Date
12/5/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements - Project No. 17-6883 <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No additional mitigation measures are required. <br />C) A substantial permanent increase in ambient noise levels in the project vicinity above levels existing <br />without the project? <br />Refer to Responses 3.12(a) and 3.12(b). Impacts would not be greater than that previously analyzed in the 1990 <br />FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No new additional mitigation measures are required. <br />d) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above <br />levels existing without the project? <br />Refer to Response 3.12(a), for discussion regarding temporary noise impacts associated with Project construction. <br />Impacts would not be greater than that previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: Refer to 1990 FEIS/EIR Mitigation Measures I-1 through I-6. <br />Mitigation Measures: No new additional mitigation measures are required. <br />e) For a project located within an airport land use plait or, where such a plait has not been adopted, <br />within two miles of a public airport or public use airport, would the project expose people residing or <br />working in the project area to excessive noise levels? <br />The Project site is not located within an airport land use plan. The nearest airport is the John Wayne - Orange <br />County Airport, located approximately 5.9 miles from the proposed Project. No impacts would occur. Impacts <br />would not be greater than that previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No new additional mitigation measures are required. <br />JJ For a project within the vicinity of a private airstrip, would the project expose people residing or <br />working in the project area to excessive noise levels? <br />Refer to Response 3.12(e). The proposed Project is not located within the vicinity of a private airstrip. Impacts <br />would not be greater than that previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No new additional mitigation measures are required. <br />3.13 POPULATION AND HOUSING <br />This section corresponds with the following 1990 FEIS/EIR, Section IV, Environmental Consequences and <br />Mitigation Measures, subsections: <br />• Subsection L, Population; <br />• Subsection M, Housing Displacement; <br />• Subsection N, Business Displacement; <br />• Subsection O, Impacts on Neighborhood Character and Minority Groups; and <br />• Subsection R, Effect on Assessed Property Values. <br />Draft I November 2017 3-22 Environmental Consequences <br />75A-51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.