My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH BRISTOL ST MEMORY LN PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
12/05/2017
>
75A - PH BRISTOL ST MEMORY LN PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2017 5:34:02 PM
Creation date
11/30/2017 7:30:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75A
Date
12/5/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements - Project No. 17-6883 <br />would not result in the physical deterioration of recreational facilities. No mitigation measures are required with <br />regards to recreational resources. Impacts would not be greater than that previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No additional mitigation measures are required. <br />b) Does the project include recreational facilities or require the construction or expansion of <br />recreational facilities which might have an adverse physical effect on the environment? <br />Refer to Response 3.15(a). The proposed Project does not include, nor would it require, construction or expansion <br />of recreational facilities. Therefore, no adverse physical impact on the environment would occur from such facilities <br />as a result of the proposed Project. No mitigation measures are required. Impacts would not be greater than that <br />previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No additional mitigation measures are required. <br />3.16 TRANSPORTATION/TRAFFIC <br />This section corresponds with the 1990 FEIS/EIR, Section IV, Environmental Consequences and Mitigation <br />Measures, Subsection U, Impacts to Transportation Facilities, and Subsection V, Construction Impacts. <br />Would the project: <br />a) Conflict with an applicable plan, ordinance or policy establishing measures of effectiveness for the <br />performance of the circulation system, taking into account all modes of transportation including <br />mass transit and non -motorized travel and relevant components of the circulation system, including <br />but not limited to intersections, streets, highways and freeways, pedestrian and bicycle paths, and <br />mass transit? <br />The proposed Project is consistent with the applicable plans, ordinances and policies establishing measures of <br />effectiveness for the performance of the circulation system as described in the 1990 FEIS/EIR. The widening of <br />Bristol Street was designated in the Orange County Master Plan, and was recommended in the Bristol Street <br />Corridor Study - Final Report, prepared by Mohle, Grover & Associates, dated 1983. It was also recommended in <br />the Arterial Highway Element - Santa Ana Element - Santa Ana Transportation Corridor State II Alternative <br />Analysis, prepared by Parsons, Brinkerhoff, Quade and Douglas, Inc., dated 1983. The proposed Project is also <br />consistent with the recommendation found in the Intercity Liaison Committee - Five -Year Transportation Study <br />Update to 1990, prepared by Basmaciyan-Damell, Inc., dated 1985. Furthermore, the proposed Project would <br />improve traffic operations through the Project corridor. Based on traffic count data provided as part of the Measure <br />M2 Comprehensive Transportation Funding Program Call for Projects, prepared by the City of Santa Ana, for the <br />Orange County Transportation Authority, dated October 20, 2016, the existing Level of Service (LOS) at the Bristol <br />Street/Memory Lane intersection is LOS C in the AM Peak Hour and a LOS E during the PM Peak Hour. Upon <br />completion of the proposed Project, the Peak Hour LOS at this intersection would be improved to a LOS B in the <br />AM Peak Hour and a LOS D in the PM Peak Hour. Therefore, the Project would result in an overall beneficial <br />impact pertaining to traffic and would not be greater than that previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No new additional mitigation measures are required. <br />b) Conflict with an applicable congestion managennent program, including, but not limited to level of <br />service standards and travel demand measures, or other standards established by the county <br />congestion management agency far designated roads or highways? <br />Draft I November 2017 3-25 Environmental Consequences <br />75A-54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.