Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements - Project No. 17-6883 <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No additional mitigation measures are required. <br />b) Police Protection? <br />Refer to Response 3.14(a)(i). The proposed Project would not result in the need or increase the demand for police <br />services in the area. Impacts would not be greater than that previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No additional mitigation measures are required. <br />C) Schools? <br />The proposed Project does not involve any new development and no new population would result. Therefore, no <br />schools or school services would be impacted by the proposed Project. Impacts would not be greater than that <br />previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No new additional mitigation measures are required. <br />d) Parks? <br />The proposed Project does not involve any new development and no new population would result. There are no <br />parks within the Project limits, and no needs for additional park services would occur as a result of the proposed <br />Project. Impacts would not be greater than that previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No additional mitigation measures are required. <br />e) Otherpublicfacilities? <br />The proposed Project does not involve any new development and no new population would result. Therefore, the <br />Project would not generate demands for other public facilities. Impacts would not be greater than that previously <br />analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No additional mitigation measures are required. <br />3.15 RECREATION <br />This section corresponds with the 1990 FEIS/EIR, Section IV, Environmental Consequences and Mitigation <br />Measures, Subsection P, Impact on Recreational Facilities. <br />a) Would the project increase the use of existing neighborhood and regional parks or other <br />recreational facilities such that substantial physical deterioration of the facility would occur or be <br />accelerated? <br />The proposed Project involves the widening of Bristol Street, just north of Memory Lane, to accommodate a third <br />southbound through lane within a highly urbanized and built -out area in the City. The widening of Bristol Street <br />would not induce growth, nor create demand for recreation -related services. Furthermore, the proposed Project <br />Draft I November 2017 3.24 Environmental Consequences <br />75A-53 <br />