My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH BRISTOL ST MEMORY LN PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
12/05/2017
>
75A - PH BRISTOL ST MEMORY LN PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2017 5:34:02 PM
Creation date
11/30/2017 7:30:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75A
Date
12/5/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements — Project No. 17-6883 <br />facilities during the exploratory digging immediately preceding excavation. In this manner, the risk of <br />line rupture to natural gas, petroleum, and sewer facilities, which might release hazardous substances <br />and odors into the air, can be minimized. <br />Mitigation Measures: No additional mitigation measures are required. <br />c) Require or result in the construction of new storm water drainage facilities or expansion of existing <br />facilities, the construction of which could cause significant environmental effects? <br />As discussed in Response 3.9(d), the Project site currently includes only curb and no catch basin is present. As a <br />result, seasonal ponding does occur along this portion of Bristol Street. The proposed Project would result in a <br />nominal increase in impervious ground surfaces. The Project would result in the relocation of the existing curb <br />features at the Project site and may include extension of the existing storm water pipeline system (located on the <br />eastern side of Bristol Street) through a new lateral connection and new catch basin at the Project site. These <br />improvements, if constructed, would result in a reduction of existing flooding and would be a beneficial impact. <br />Thus, impacts would not be greater than previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required. <br />d) Have sufficient water supplies available to serve the project front existing entitlements and <br />resources, or are new or expanded entitlements needed? <br />The proposed Project entails the intersection improvements; as such, the Project would not result in any increase in <br />water demand/consumption. Landscape improvements, if applicable, would not require any new or expanded water <br />entitlements and would not be substantially increased, compared to that analyzed as part of the Bristol Street <br />Widening Project. Thus, the proposed Project would not create any new significant environmental impact. Impacts <br />would not be greater than previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required. <br />e) Result in a determination by the wastewater treatment provider which serves or may serve the <br />project that it has adequate capacity to serve the project's projected demand in addition to the <br />provider's existing commitments? <br />Refer to Response 3.17(a) and 3.17(b). The proposed Project would not result in an increase in wastewater <br />production. Impacts would not be greater than previously analyzed in the 1990 FEIS/EIR. <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable. <br />Mitigation Measures: No additional mitigation measures are required. <br />f) Be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste <br />disposal needs? <br />The proposed Project would generate construction waste on a short-term basis. Construction waste that cannot be <br />recycled would be taken to available landfills. The closest receiving landfills for the City are the Frank R. <br />Bowerman Sanitary Landfill at 11002 Bee Canyon Access Road in Irvine, and the Olinda Alpha Landfill at 1942 N. <br />Valencia Avenue in Brea. The Frank R. Bowerman Sanitary Landfill, which is owned and operated by the Orange <br />County Integrated Waste Management Department, opened in 1990, and has enough projected capacity to serve <br />residents and businesses until approximately 2053.16 The Olinda Alpha Landfill opened in 1960, and has enough <br />16 Orange County Waste and Recycling, Frank R. Bowerman Landfill, http://www.oclmdfills.com/landfilYactive/ <br />bowennan, accessed August 17, 2017. <br />Draft I November 2017 3-29 Environmental Consequences <br />75A-58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.