Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements — Project No. 17-6883 <br />Modified Initial Study Checklist <br />The following Modified Initial Study Checklist is based on the California Environmental Quality Act (CEQA) Initial <br />Study Checklist. It is modified to evaluate the proposed Project changes for which environmental impact <br />reports/statements have previously been completed to assist in the determination of the need for supplemental <br />environmental documents, in this case, a Subsequent or Supplemental EIS/EIR or an Addendum under Public <br />Resources Code 21166 and Guideline Sections 15162, 15163, and 15164, respectively. For purposes of this study, <br />references to "the proposal" in the left hand column questions refer to the modifications to the Project (proposed <br />Project) as compared the Project improvements evaluated in the 1990 FEIS/EIR. <br />The first four columns to the right of the modified checklist questions identify whether the proposed Project changes <br />would result in new impacts, and if so whether these impacts would be less than significant, less than significant <br />after mitigation, or significant. <br />The fifth column asks whether or not the impacts associated with Project changes, if any, were sufficiently disclosed <br />in the previous environmental documents. <br />Finally, the last column indicates whether or not a Subsequent or Supplemental EIR is needed. Moreover, a <br />Subsequent or Supplemental EIR would be needed if there were new significant unmitigated or substantially more <br />severe impacts, which would result from the Project changes and which were not sufficiently disclosed in the <br />previous environmental document. <br />Draft I November 2017 1 Appendix A — Modified Initial Study Checklist <br />75A-64 <br />