Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements —Project No. 17-6883 <br />i) Expose people or sbvctures to a significant risk of Loss, injury or death irwolvhV flooding, <br />includingflooding as aresult of thefuhue of ¢levee trouts? <br />The proposed Project does not involve the construction of new habitable structures or people at the Project site <br />Therefore, the Project would not expose people or habitable structures to a significant flooding risk beyond that <br />which already exists. Impacts would not be greater than previously analyzed in the 1990 FEIS/EIR <br />Certified 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures arerequired. <br />j) Inundation by seiche, hununi, or muojlow? <br />The Project site is located approximately 15 miles inland from the Pacific Ocean; therefore, the likelihood of <br />tsunami impacting the site is minimal. The Project site and vicinity are highly urbanized and there are no nearby <br />water bodies or unusual slopes or geologic features in the area. No impacts involving seiche, tsunami, or mdflow <br />are anticipated. Impacts would not be greater than previously analyzed in the 1990 FEIS/EIR. <br />Certifled 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measure: No additional mitigation measures are required. <br />3.10 LAND USE AND PLANNING <br />This section corresponds with the 1990 FEIS/EIR, Section IV, Environmental Consequences and Mitigation <br />Alearures, Subsection A, Landform Modification. <br />Would the project: <br />a) physicaby divide an established commundy? <br />The proposed Project involves the widening of the intersection of Bristol Street and Memory Lane; the proposed <br />Project would not divide an established community. Although the proposed widening of Bristol Street within the <br />Project limits would result in partial acquisition of existing properties, the Project would not create a physical barrier <br />to, or separate, a community. Impacts would not be greater than that previously analyzed in the 1990 FEIS/EIR. <br />Certifled 1990 FEIS/EIR Mitigation Measures: No 1990 FEIS/EIR mitigation measures are applicable <br />Mitigation Measures: No additional mitigation measures are required. <br />b) Coaket mitt my applicable Iced use plus policy, or regulation of an agency svth jurisdiction over <br />the project (including, bid not limited to the general plus specfic plus Local coastal program, or <br />Eonueg ordtseuece) adoptedfor the purpose of avoiding or mitigating an environmental effect? <br />According to the City of.SardaAm General Plan (General Plan), the Project area is designated General Commercial <br />(GC) and Low Density Residential (LDR-7). The zoning designation of properties within the Project area are <br />Speck Development (SD27) which is developed as the Portofino Apartments and Community Commercial (Cl) <br />which allows for retail and service uses. The proposed Project would not result in changes to the land use <br />designation ofthe acquired parcels. The proposed Project is in compliance with the existing designations and would <br />not create a new conflict It is acknowledged that due to building setback requirements, the Project would require <br />approval from the City Manager for landscape strip Exceptions for building setbacks per Municipal Code Section <br />41-781. With City Manager approval, the Project would be consistent with the Municipal Code requirements. No <br />significant impacts would result and impacts would be similar to those identified in the 1990 FEIS/EIR. <br />Final I December 2017 3-19 Environmental Consequences <br />