Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements -Project No. 17-6883 <br />MODIFIED INITIAL STUDY CHECKLIST <br />Final I December 2017 11 Appendix A- Modified Initial Study Checklist <br />New Impacts ofProposed <br />Premous FEISIEIR <br />Project Changes <br />No <br />Less Than <br />Less Than <br />Potentially <br />Impacts <br />Subsequent or <br />Impact <br />Significant <br />Significant <br />Significant <br />Disclosed? <br />Supplemental EIR <br />Impact <br />After 1990 <br />Impact <br />Required? <br />Mitigabon <br />17. TRIBAL CULTURAL RESOURCES. <br />a) Would the project cause a substantial <br />adverse change in the significance of a <br />tribal cultural resource, defined in Public <br />Resources Code section 21074 as either a <br />site, feature, place, cultural landscape that <br />is geographically defined in terms of the <br />size and scope of the landscape, sacred <br />place, or object with cultural value to a <br />California Native American tribe, and that <br />I5: <br />i) Listed or eligible for listing in the <br />California Register of Historical Resources, <br />or in a local register of historical resources <br />X <br />YES <br />NO <br />as defined in Public Resources Code <br />section 5020.1(k), or <br />ii) A resource determined by the lead <br />agency, in its discretion and supported by <br />substantial evidence, to be significant <br />pursuant to criteria set forth in subdivision <br />(c) of Public Resources Code Section <br />X <br />YES <br />NO <br />5024.1. In applying the criteria set forth in <br />subdivision (c) of Public Resource Code <br />Section 5024.1, the lead agency shall <br />consider the significance of the resource to <br />a California Native American tribe. <br />18. UTILITIES AND SERVICE SYSTEMS. <br />Would the project: <br />a) Exceed wastewater treatment <br />requirements of the applicable Regional <br />X <br />YES <br />NO <br />Water Quality Control Board? <br />b) Require or result in the construction of <br />new water or wastewater treatment <br />facilities or expansion of existing facilities, <br />X <br />YES <br />NO <br />the construction of which could cause <br />significant environmental effects? <br />c) Require or result in the construction of <br />new storm water drainage facilities or <br />expansion of existing facilities, the <br />X <br />YES <br />NO <br />construction of which could cause <br />significant environmental effects? <br />d) Have sufficient water supplies available <br />to serve the project from existing <br />X <br />YES <br />NO <br />entitlements and resources, or are new or <br />expanded entitlements needed? <br />Final I December 2017 11 Appendix A- Modified Initial Study Checklist <br />