Laserfiche WebLink
Exhibit B <br />M5 +MEGT Collaborative <br />Landscape Architecture I Urban Design I Plpnning <br />305 North (.bast Hwy Sumo r <br />Laguna Beach CA 4'7.EI51. <br />949.375.E,23 <br />July 17, 2017 <br />City of Santa Ana <br />Public Works Agency; <br />20 Civic Center Plaza; 3rd floor Reception, Ross Annex <br />Santa Ana, CA 92701 <br />Attn,: Suzi Furjanic <br />Re: PEE PRPf7SAIL-City of Santa Ana Center Street Urban Greeoing, RFP 17-012 <br />Dear Ms, Furjanic; <br />MS + M3GT Collaborative (MMO Is pleased to submit this landscape Architecture ssrvlcas proposal for <br />the above -mentioned project, We have built a reputation on our strength In working with owners, <br />Architects and other consultants and we welcome thls opportunity to work with the City of Santa Ana In <br />creating a high -quality project, <br />MMC has provided the following Fee proposal including Sub -Consultant's and potential expenses. MMC <br />reserves the right to wso other Sub -consultants upon City `s approval, should that deem necessary due to <br />unforeseen circumstances Le. Deadline commitments due to work overload, Major changes In the <br />company etc, <br />A, Scope of Work <br />The Scope of Work Involves removal of approximately y3,000 square feet of asphalt paved street <br />and caltvartmg the area topassive landscaped open space. The project, as represented in the concept <br />plan shall Include the following components: <br />1. Street removal and Infill <br />2, Grading <br />3, Permeable walkway installation <br />4. Construction of rock blo-swale <br />5. Californla Friendly landscaping wlth drought tolerant properties <br />6, Automatic drip irrigation system <br />7, Slte Amenities, Including Interpretive signage, benches, picnic tables, bike racks <br />3, Drainage which utilizes "Low Impact Development', concepts with goal for full site Infiltration, <br />Task 1: Pre-Design/Schematic Design <br />1, ltick off meeting with the client to disc.liss the project expeLtation, to discuss scope of work, <br />project, goals and objectives, potential elements, issues, schedule and general character of the <br />enhancements. <br />Pagn 1 of 4 <br />