Laserfiche WebLink
2. Visit the site, Photograph and note the general character of the site and suitable areas for new <br />features. <br />3. Prepare concept plan to Include proposed plan, Images, plant materials, hardscape elements, <br />and Opinion of Probable cost for Iandscape, <br />4, Civil Eng, to prepare Survey plan, <br />S, Present Concept plan for review and make ravlelon to the plan per review meeting for approval. <br />Deliverables shall include (1) rendered concept plan. <br />Task Ih Design Development 50% Plans <br />Based upon the client approved concept Plan, prepare Design Dovoloprnent plans which shall include <br />landscape architectural and civil engineering, to Inc Iuda the following: <br />1. Raviaw and Coordinate with civil engineer regarding layout, grading and drainage concepts, <br />2. Prepare hardscape layout design and propose paving material selection, and landscape ilghtlng. <br />3. Prepare major site eloments details. <br />4. Develop site features plan with proposed elements selections. <br />S. Prepare planting plan with detailed plant legend. <br />6. Prepare Civil Eng. plans to Include: site Erosion, I ONWntal vertical control Pan, Lip/WQMP. <br />7. Geoteeh to commence tests, analysis and report. <br />S. Refine opinion of probable construction cost. <br />5. Draft spocifleatlons <br />Doliverablas shall include a 5C%set of plans, draft specification and "Opinion of Probable Cost' <br />Task 11h Construction Documents (90% and 100%) <br />Based upon the client approved design development plans and estimated construction budgets, AR shall <br />prepare construction documents for the project, including the following; <br />1. Title Shoat, <br />2, Complete all Civil Engineering Pans (Site Erosion plan, Horl2ontal and Vertical Control plans, <br />Grading and Drainage, LiD/WQMP, Hydrology, Specifications) <br />3, Complete all landscape Construction plans (hlardscape layout ad Details, Planting Plan and <br />Details, Irrigation Plan, Details, and Calculations, Site furnishing Plan and Specs,) <br />4, Prepare a site furnishing plan. <br />5, Site 6lettrloal Plan and Calculations <br />6, Complete CSI format specifications <br />7, Final opinion of probable cost. <br />Technical $pacification <br />Technical specifications for all components listed above shall be provided by Consultant, or their Sub - <br />consultants, to the City in CSI (Construction Specifications Institute) format, City Staff will combinetheso <br />specifications with the City Boller Plate which together, will become the Project Manual, <br />Pape 2 of 4 <br />