Laserfiche WebLink
COY Ors,ANTAAN� RFP17-02- Center Street wbnGreenIng IWISa�Mlfcl;aTCallraborativQ' <br />DoWled Fee Schedule of the proposed Costs <br />I, Pre- Design, Concept Plan Package <br />M$ <br />$150/hr <br />20 <br />MA <br />$170/hr <br />28 <br />Staff <br />$75/hr <br />30 <br />1,246 <br />$ <br />8,610,00 <br />II, Desrgn Devdlopment-50% <br />Ms <br />$150/hr <br />24 <br />MA <br />$1,2,0/hr <br />40 <br />Staff <br />$.75/hr <br />60 <br />.19% <br />$. <br />12,900.00 <br />I,11, Construction Document-100% <br />MS <br />$150/hr <br />14 <br />MA <br />$120✓hr <br />45 <br />Staff <br />P5/hr <br />60 <br />19% <br />$ <br />9400„00 <br />IW.BIdAdverk'ise'nieot/Construction <br />MS <br />$150/hr <br />6 <br />Administration/As. Built pl'ens <br />MA; <br />$120/4r <br />14 <br />Staff <br />$7.5/hl" <br />19 <br />MS+MEOT <br />54% <br />$ <br />38,940,00 <br />Subconsultants and Mi,sc.. <br />PR &. FYS dates <br />SVD <br />W <br />6,OOD <br />A25.0C Eng. <br />...12p% <br />$- <br />8,615 <br />Pore.slight Englneering <br />26% <br />19,000. <br />$ <br />33,615.00 <br />LEGEND <br />MA Msr)arehAfkhamJ <br />W M'onica $[nr1Pw1 <br />TOTAL <br />$ <br />72,555,00 <br />Me; 6xpenscaa <br />5oik:Agri:cultural, test <br />W00,06 <br />Repragraph1h <br />$z0QQ.DQ <br />