My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55C - RESO CONSULT DESIGN SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
01/16/2018
>
55C - RESO CONSULT DESIGN SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 7:12:46 PM
Creation date
1/11/2018 7:05:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55C
Date
1/16/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tip <br />LSS Engineering <br />$56,370 <br />$0 <br />$56,370 <br />KPJ <br />Cost Estimating <br />$6,000 <br />$1,500 <br />$7,500 <br />Karl Kranz <br />Husbandry Expert <br />$4,000 <br />$0 <br />$4,000 <br />CDA <br />CASp Study <br />$860 <br />$5,660 <br />$6,520 <br />Subtotal Fees. <br />'$296;920 <br />$iZ8,i5D <br />$425,486 <br />Expenses <br />$16,775 <br />$0 <br />$16,775 <br />Surveyfteclalty Services <br />KPFF Survey <br />Topographic survey <br />"'$8,500 <br />$3,000 <br />$11,500 <br />Laguna Geo <br />Geotech Engineering <br />$0 <br />$3,200 <br />$3,200 <br />Subtotal-:, <br />$14,700. <br />Total Fees & <br />Expenses <br />$322,195 <br />$134,760 <br />$456,955 <br />. Previously authorized Amendment <br />Assumptions/Clarifications: <br />1. Topographic Survey — See attached proposal from KPFF for expanded survey work. The <br />amount noted above ($3,000) is the minimal scope required for the expanded project <br />site and CASp study, Within the attached proposal, KPFF has also identified an <br />additional amount ($7,500) to provide an expanded survey for the Riverine Zone <br />(project zone tied to Amazon's Edge as part of Master Plan) If this work area is desired <br />at this time. <br />a. As noted in the attached proposal, the topographic survey includes <br />documentation of utilities evident from surface conditions. If more detailed <br />investigation of underground utilities is desired/required, utility locating <br />services will be required. <br />2. CASp—this proposal includes an accessibility evaluation of the Amazon's Edge facilities <br />and associated pedestrian paths, beginning with the zoo entrance following a path of <br />travel to and around the project site. Services include: <br />a. Conduct walk-thru of project area assigned to CDA and provide physical reviews <br />of specific project conditions affecting access compliance for notification to <br />Client. <br />b. Evaluate, document, and report conditions associated with on-site pedestrian <br />routes of travel connecting public entrance of the zoo to the new Amazon's <br />Edge exhibit area. <br />c. Evaluate, document, and report conditions associated with existing restroom <br />building. <br />d. Evaluate, document, and report conditions associated with existing view <br />structure. <br />e. Evaluate, document, and report conditions associated with existing animal <br />holding building. <br />f. CDA shall evaluate observed conditions for conformance versus state and <br />federal accessibility standards, including the following: <br />55C-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.