My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (16)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ALL AMERICAN ASPHALT (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 9:18:23 AM
Creation date
1/30/2018 10:05:40 AM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT
Contract #
17-6881
Agency
Public Works
Council Approval Date
10/3/2017
Document Relationships
20A - AA - CONTRACT TO AMERICAN ASPHALT FAIRVIEW MAINTENANCE
(Related to)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2017\10/03/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECTNO.:17-6881 Exhibit A <br />FAIRVIEW STREET PAVEMENT MAINTENANCE <br />BID PROPOSAL <br />TO: CITY COUNCIL OFTHE CITY OF SANTA ANA <br />FROM: All American <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the tout price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Un classifiedExeavation <br />loo <br />CY <br />$ <br />33.0 <br />$ Soo <br />2 <br />Rubberized Emulsion Aggregate Slurry <br />Type <br />1,100 <br />TN <br />(REAS), 11 <br />57-1 o0 <br />3 <br />AspahltRubber Hot Mix (ARHM)" <br />3,200 <br />'t'N <br />_ <br />$ 400 <br />$ 3i)7Z00 <br />11 <br />Coldmill (2")* <br />244,900 <br />SF <br />o. as <br />$ 6I,2zS <br />5 <br />Crack Sealing <br />1 <br />LS <br />$ <br />5�1,3cc� <br />$ <br />5 7, 3 0o <br />6 <br />Remove and Replace PCC Curb Ramp <br />11,200 <br />SF <br />$ I'_i t 5 <br />$ I (6 '32 v <br />7 <br />Remove and Replace PCC Sidewalk * <br />1,500 <br />SF <br />$ In � 1 <br />$ 16 1 w <br />8 <br />Adjust Manhole Frame & Cover to <br />2 <br />EA <br />$ <br />11500 <br />$ <br />1,5$ o <br />Finished Grade <br />9 <br />Furnish and Install New Water Valve <br />Frame & Cover <br />_ 6 <br />EA <br />$ $i7. oo <br />$ <br />to Finished Grade <br />i - <br />10 <br />Furnish and Install Pull Box #6 and Adjust <br />to Grade <br />2 <br />EA <br />$$ <br />,d�6o�� <br />SiZoo <br />1 I <br />Protection of Surface Utility Frames & <br />I <br />LS <br />$ I U �a <br />$ <br />Covers <br />12 <br />Install Traffic Loop Type El- <br />60 <br />EA <br />$ <br />$ 1 $ 0 ? o <br />13 <br />Install Traffic Loup Type D it <br />22 <br />EA <br />.$ t� <br />$ <br />i13k.o� <br />14 <br />Temporary Construction Sign <br />4 <br />EAr„ <br />$ I,zoo <br />$ 0a <br />P-1 ofP-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.