My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT WATER SYSTEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
02/06/2018
>
25E - AGMT WATER SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 7:02:51 PM
Creation date
2/1/2018 7:10:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
2/6/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENTERPRISE <br />AUTOMATION <br />2 Proposal Background <br />Enterprise Automation <br />210 Goddard Irvine CA 92616 USA <br />Tel 949-769-6000 Fax 949-7696005 <br />v .eainteorafor.com <br />The City of Santa Ana released RFP 17.112 soliciting bids from qualified systems <br />integrators; to provide several consultative and design services aimed at promoting <br />standardization and best practices. This project is a continuation of the City's <br />initiative to mitigate risk and improve the serviceability of their SCADA system. <br />The RFP specifically solicited proposals for the sole source development of control <br />panel designs and functional specifications for two pump stations and four <br />pressure reducing valve stations, which will be upgraded in the future. <br />Additional scope includes the development of programming and testing <br />specifications for those sites, the development of source control and change control <br />systems, and support services for those systems throughout the life of the three <br />year contract. <br />Enterprise. Automation has a thorough understanding of the City's needs, <br />expectations, and quality standards as, we have been providing similar services to <br />the City since 2014, with great success. Projects include: <br />1: East Pump station (June,2014 —May 2015) <br />a. Functional Specification <br />b. Test documentation (FAT and SAT) <br />c. On-site testing and support <br />2. SA -5 Lift Station (July 2014 —present) <br />a. Functional Specification <br />b. Design and specifications review <br />c. On-site testing and support <br />3. San Lorenzo Lift Station (February 2015 present) <br />a. Control panel design and factory acceptance testing <br />It. Design and specifications review <br />c. .Functional Specification <br />I Test document development (FAT and SAT) <br />4. Walnut Pump Station Flay 2016 —,present) <br />a. Existing condition technical memorandum. <br />i. Site surveys and operations workshops <br />b. Functional Specification <br />c. PLC standard code modules and documentation <br />d. OIT programming standards documentation <br />e. Design and specifications review <br />f. Testing documentation development (FAT and SAT) <br />g. On-site testing and support <br />Client City of Banta Ana Revision: 1.0.0 <br />Document: Response to RFP 17-112 Date: 11/2112017 <br />Section: Scope of Services & Schedule Page Number 6 of 31 <br />25E-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.