My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT WATER SYSTEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
02/06/2018
>
25E - AGMT WATER SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 7:02:51 PM
Creation date
2/1/2018 7:10:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
2/6/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENTERPRISE <br />AUTOMATION <br />Enterprise Automation <br />210 Goddard Irvine CA 92618 USA <br />Tel 949-7698000 Fax 949-769-6006 <br />�.eaintearatdreom <br />This scope of work represents Enterprise Automation's proposed approach to the <br />RFP requirements as well as several supplementary recommendations which will <br />add value to the City's SCADA and automations assets, and also minimize the <br />City's exposure to operational, maintenance, and project related risks. <br />3 Project Goals <br />The 'goals of this project are to: <br />1. Continue the process of developing'documentation;formats and standards <br />that can be re -used on future City projects <br />2. Ensure that the control requirements for the facilities are documented and <br />implemented, taking into account the needs of a variety of City <br />stakeholders <br />3. Ensure that the facility operates as intended by the City once the project <br />concludes <br />4. .Implement oversight mechanisms for the City's contracted PLC <br />programmers <br />5. Promote transparency and intentional oversight for approved modifications <br />to site programs. and configurations <br />4 Project Approach <br />Our project approach is designed to: <br />1. Reduce overall project risk by leveraging EA's highly certified staff and in- <br />depth knowledge of industry best practices <br />2. Maximize client engagement at all necessary levels (operations, <br />maintenance, and management) to ensure that the functional specifications <br />and panel designs meet or exceed the City's requirements <br />3. Promote thorough testing of everything where practical, prior to site <br />deployment to reduce the probability of rework being necessary in the field <br />4. Leverage ENS previous experience working with the City's water team to <br />prevent re -work and promote consistency <br />5 Assumptions <br />Please see Section 9 for Assumptions and Clarifications that apply to this scope of <br />work. <br />f Client: City of Santa Ana Revision: 1.0.0 <br />Document: Response to RFP 17-112 Date: 11/2112017 <br />Section: Scope of Services $ Schedule Pae Number 7 of 31 <br />25E-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.