My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT WATER SYSTEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
02/06/2018
>
25E - AGMT WATER SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 7:02:51 PM
Creation date
2/1/2018 7:10:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
2/6/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENTERPRISE <br />AUTOMATION <br />Enterprise Automation <br />210 Goddard Irvine CA 92618 USA <br />Tel 949-76943000 Fax 949.769-6005 <br />w .eaintearatoccam <br />6. For EA to gauge the PLC programmer's comprehension of the specification <br />7.. For EA to gauge the competency of the PLC programmer <br />[TI& additional effort isnotizidudedin Fee Pmpoaal[ <br />Key Deliverables <br />Client requested: <br />a) Functional Specifications for each site <br />Instrument database <br />1/0 and communications database <br />Additional scope (value adW <br />a) Technical Memorandum for each site (included in the fee proposal) <br />b) Technical Memorandum review workshop for each site. (included in <br />the fee,proposal) <br />7.6 Programming and testing specifications <br />Leveraging the templates and significant portions of the documents developed for <br />the East Station, SA -5, San Lorenzo, and Walnut Pump Station projects, EA will <br />develop several types of test documentation for each site; <br />1. Control Panel FAT documentation, for use by: <br />a. The PLC programmer for internal panel testing prior to a formal <br />witnessed FAT <br />b. EA to conduct a.formal witnessed panel FAT at the PLC <br />programmer's facility <br />2. Control System FAT documentation, for use by: <br />a. The PLC programmer for internal testing of PLC, OIT, and ancillary <br />equipment, prior to a formal witnessed control system FAT <br />b. EA to conduct a formal witnessed control system FAT at the PLC <br />programmer's facility <br />3. Control System SAT documentation, for use by: <br />a. By the PLC programmer, Enterprise automation, and the City <br />during site commissioning <br />b. By the PLC programmer, Enterprise automation, and the City <br />during formal site acceptance testing <br />The test documentation will cover PLC/SCADA related controls only. Any process <br />testing requirements, such as pump capacities, system pressures, etc. must be <br />provided by the City. <br />Client: City of Santa Ana Revision: 1.o.0 <br />Document: Response to RFP 17-112 Dale: 11i21l2017 <br />Section Scope or Services & Schedule Pae Number 19 of 31 <br />25E-31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.