My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT WATER SYSTEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
02/06/2018
>
25E - AGMT WATER SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 7:02:51 PM
Creation date
2/1/2018 7:10:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
2/6/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENTERPRISE Enterprise Automaton <br />TAUTOMATION 210 Goddard Irvine CA 92618 USA <br />Tel 94900 Fax 949-769-6005 <br />1wn✓.eaIntegrintearatoccom <br />7.5.2 Specification development <br />Utilizing the information gathered during the preparation phase, EA will develop <br />detailed functional specifications for each site. The functional specifications will <br />contain the following information, as called for in the RFP: <br />a) Narrative overview of the function and operation <br />b) Identification of all components (i.e. equipment, instrumentation, etc.) <br />a. Narrative description of the functionality of each component <br />c) Narrative description of'alloperational modes <br />d) Description of theprocess control strategies <br />a. Identification of the specific I/O, setpoints, commands, and <br />communications associated with each strategy <br />b. Detailed description of the control logic for each component/strategy, <br />.including permissives, interlocks, PID controls, etc. <br />e) Description of the SCADA interfaces <br />f) Narrative and detailed description of system alarms and other notification <br />functionality <br />Once complete, EA will submit the specification to the City for review. <br />7.5.2.1 Functional specification review workshop <br />To ensure the City's complete understanding of the specification, EA will conduct a <br />full day workshop with the City to review, explain, and discuss the contents as <br />necessary. <br />Following the workshop and receipt of the City's review comments, EA will update <br />the documentation per City comments. <br />7.5.3 Specification handover to PLC programmer <br />It will also be necessary to conduct a handover workshop with the PLC <br />programmer. The purpose of the handover is: <br />1. For EA to establish a working relationship with the PLC programmer <br />2. To explain the terminology used in the specification <br />3. To ensure the PLC programmer understands the intended operation of the <br />site <br />4. To'ensure that the PLC. programmer accepts the requirement to explicitly <br />comply with the specification <br />5. To provide a forum for the PLC programmer to ask questions <br />Client: City of Santa Ana Revision: 1.0.0 <br />Document Response to RFP 17-112 Date: 11/21/2017 <br />Section: Scope of Services & Schedule Pae Number 18 of 31 <br />25E-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.