Laserfiche WebLink
V-6®LTAIC <br />v�o.a <br />Project #:73-727.4 <br />City Hall — Ross Annex <br />Location: 20 Civic Center Plaza <br />Santa Ana, CA 92701 <br />NJPA #: 051017 -CPI <br />CHARGING UNrr MONNTINGTYPE(s): BOLLARD <br />TOTAL# OF PARKING FOR EV: EIGHT(8) <br />Price Breakdown: <br />Electrical/Construction, Labor and Material $23,689.00 <br />EVCS Unit(s) and Service(s) $28,729.00 <br />Total Price: $52,418.60 (tax included) <br />Electrical/Construction. Labor and Material includes: <br />• Proposal consists of project management and site planning, engineering and designing for any necessary <br />permit acquisitions, <br />o Permit acquisitions also include the plan checking, and Inspection processes (not including <br />actual plan check fee, permitting and/or inspection fees) as required by the authorities having <br />jurisdiction. <br />• Perform Site Validation survey (SVS) as required by ChargePoint, Inc. prior to activation of units. SVS fee <br />to ChargePoint, Inc. discounted when using ChargePoint, Inc. Certified Installers. <br />o Standard electrical power consistency evaluation: circuit breaker and electrical panel evaluation. <br />o Cellular network communications test: test for consistency of cellular signal strength. <br />o Charging station evaluation: consistent voltage, amperage, ground, network communication. <br />ELECTRICAL EQUIPMENT UPGRADE <br />• None. <br />o Use eight (8) available spaces In existing electrical panel "ETC <br />CHARGING UNIT INSTALLATION <br />Installation and commissioning of eight (8) charging unit to meet NEC requirements. <br />Supply and installation of eight (8) 40A circuit breakers for EVC.S overcurrent protection. <br />o Utilization of existing electrical panels to supply eight. (8) 30A circuit to new charging unit. <br />o From the electrical panel(s) to new charging station, the new electrical conductors: #6 and #10 <br />ground wires. <br />.9 - <br />Video Voice Data Communications I Voltaic Division 112681 Pala Drive, Garden Grove, CA 92841Pnnt Date: January 17, 2018 <br />75A-26 <br />