Laserfiche WebLink
�vOLTAIC <br />Project N:73-727.4 <br />'CELLULAR SIGNAL COMMUNICATION <br />Cellular signal readings are not adequate for ChargePoint EV charging station per ChargePoint <br />manufacture specifications. <br />Supply and installation of 3G cellular booster with two-way splitter for EV charging stations. <br />PROVISIONS FOR FUTURE GROWTH <br />• None <br />PARKING MODIFICATIONS <br />• Stenciling/marklhg "EV CHARGING ONLY" for eight (8) EV parking. spaces. <br />• Supply and mounting of eight (8) bolt -down steel sign posts with EV parking signage, <br />RELATED CONSTRUCTION WORK <br />• Using existing conduit, infrastructure from electrical room to the junction box located near parking space <br />55. (Includes approximate wire runs of+300') Shall the length of the pull exceed, pricing will be charged <br />accordingly). <br />• Placement of EMT, approximately+180'. <br />• Boit-down of units on existing basement concrete. <br />• GPR scanning for bolt down of units. <br />INMAL9 DATE <br />-10- <br />Video Voice Data Communications I Voltaic Division 112681 Pala Drive, Garden Grove, CA 92841 Print Dite: January 17, 2018 <br />75A-27 <br />