Laserfiche WebLink
�OLTA IC <br />I... V.C[ Mu c....w —... <br />Project #:73-727.4 <br />o Utilization of new electrical panel to supply two (2) 3 D circuits to new charging unit. <br />o From the electrical panel(s) to new charging stations, the new electrical conductors: #8 and #10 <br />ground wires. <br />PROVISIONS FOR FUTURE GROWTH <br />• New electrical equipment will support up to six (6) additional charging ports for future use. <br />.PARKING MODIFICATIONS <br />• Stenciling/marking "EV CHARGING ONLY" for two (2) EV parking spaces. <br />• Supply and mounting of two (2) EV parking signs on existing wall surface. <br />RELATED CONSTRUCTION WORK <br />• Core drilling. <br />• GPRscanning for core diil]. <br />t Placement of EMT, approximately+40'. <br />INmALS DATE <br />-13- <br />Video Voice Data Communications I Voltaic Division 112681 Pala Drive, Garden Grove, CA 92841 Print Date: January 17, 2018 <br />75A-30 <br />