Laserfiche WebLink
VOLTAIC <br />......... <br />Project Ht73-727.4 <br />City Hall — Civic Center <br />Location: 20 Civic Center Plaza <br />Santa Ana, CA 92701 <br />N1PA k: 051017 -CPI <br />CHARGING UNIT MOUNTING TYPE(S): WALL <br />TOTAL N OF PARKING FOR EV: Two (2) <br />Price Breakdown: <br />Electrical/Construction, Labor and Material $18,201.00 <br />EVCS Unit(s) and Service(s) $6,794.00 <br />Total Price: $24,995.00 (tax included) <br />Electrical/Construction. Labor and Material Includes: <br />Proposal consists of project management and site planning, engineering and designing for any necessary <br />permit acquisitions. <br />o Permit acquisitions also include the plan checking, and inspection processes (not including <br />actual plan check fee, -permitting and/or ins ection fees) as requirre'dby the authonles fiavTng- -- <br />jurisdiction. <br />Perform Site Validation survey (SVS) as required by ChargePoint, Inc. priorto activation of units. SVS fee <br />to ChargePoint, Inc. discounted when using ChargePoint, Inc. Certified Installers. <br />o Standard electrical power consistency evaluation: circuit breaker and electrical panel evaluation. <br />o Cellular network communications test: test for consistency of cellular signal strength. <br />o. Charging station evaluation: consistent voltage, amperage, ground, network communication. <br />ELECTRICAL EQUIPMENT UPGRADE <br />Supply and installation of new 75kVA transformer to provide adequate power and proper voltage rating <br />fo"r a new electrical panel. <br />o New 125A circuit breaker to provide overcurrent protection to transformer. New conductors in <br />new EMT sized per NEC requirements. <br />o Installation of grounding system for transformer per NEC requirements. <br />Supply and installation of new 200A electrical panel for EV charging units. Materials and installation to <br />meet NEC, building department requirements, and if enforced, by building department. <br />CHARGING UNIT INSTALLATION <br />e Installation and commissioning of one (1) charging unit to meet NEC requirements <br />• Supply and installation of two (2) 40A circuit breakers for EVCS overcurrent protection. <br />-12- <br />Video Voice Data Communications I Voltaic DiV6ion 1 12631 Pala Drive, Garden Grove, CA 92841 .Print Date: January 17,201-9 <br />75A-29 <br />