My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT TRAFFIC SIGNAL SYNC BEAR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
02/20/2018
>
25D - AGMT TRAFFIC SIGNAL SYNC BEAR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2018 5:57:37 PM
Creation date
2/15/2018 5:52:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25D
Date
2/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. Designate a technical lead person to act as the liaison for the PROJECT. <br />The Ilalson and any other required personnel shall attend and participate <br />in all PROJECT -related meetings and participate on the OCTA Traffic <br />Forum. <br />ii. Participate, cooperate and coordinate with contractors, consultants, <br />vendors and staff in good faith using reasonable efforts to resolve any <br />unforeseen issues and disputes arising out of the PROJECT to the extent <br />practicable with respect to the performance of the PROJECT. <br />iii. Identify and verify the upgrades to Traffic Control Elements to be <br />constructed and installed as part of the PROJECT and as identified In the <br />project application for each city. <br />iv. Coordinate the inclusion of other Traffic Control Elements and in-kind <br />services, where necessary, that the city requires for the implementation of <br />the PROJECT but are not included in the project application. Each city <br />shall be responsible for the inclusion of such elements within reason. <br />v. Maintain PROJECT -related signals and telecommunications equipment <br />with high priority during the PROJECT and be responsible for repair of the <br />signal control systems in its jurisdiction. <br />vi, Provide on-site support for signal control systems, timing plans, detection <br />systems and related equipment during construction, installation and <br />integration, and be available to change or make adjustments to timing <br />plans at a central or field location when necessitated by the PROJECT. <br />vii, Document in-kind match or dollar match funding as identified in the project <br />application and provide verification of such expenditures as part of any <br />required review or audit process, which may include payroll records, <br />contracts and purchase orders. <br />viii. Monitor and operate the traffic signals and improvements for a period of <br />two (2) years following the completion of the Primary Implementation <br />Phase of the PROJECT and provide verification of such activities as <br />required by Measure M2 program funding. <br />4. RESPONSIBILITIES OF SANTA AN <br />SANTA ANA agrees to the following responsibilities for implementation and <br />funding of the PROJECT: <br />a. To authorize COSTA MESA to be the Administering Agency for the <br />PROJECT. <br />25D-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.