My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH CANNABIS TESTING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
02/20/2018
>
75B - PH CANNABIS TESTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 2:09:00 PM
Creation date
2/15/2018 6:50:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
2/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and shall be notified in writing whether they are a 'RSP Eligible Applicant' or not. Each <br />applicant on the RSP Eligibility List may then choose to file an application for a RSP in <br />Phase 2., <br />C. The requirements for Phase 1 include but are not limited to: <br />All application documents required in the City's Phase 1 <br />Registration Application package. <br />ii. Application was submitted during the application period. <br />iii. Application forms are filled out completely. <br />iv. Business Owner(s)/Applicant(s) referenced on the application <br />provides a Live Scan that was conducted within 14 days prior to <br />submitting the application. <br />V. Phase 1 application fee is paid. <br />vi. A signed statement that the proposed location of the Adult Use <br />commercial cannabis retail business on the application meets the <br />zoning criteria established in this article including, but not limited to, <br />any and all sensitive use separation criteria required by this article. <br />d. The Director of Planning and Building or his or her designee(s) shall <br />determine whether each application demonstrates compliance with the minimum <br />requirements (above) and be placed on the RSP Eligibility List and entered into the <br />Phase 2 application and review process. <br />e. The Director of Planning and Building or his or her designee(s) shall review <br />each application upon submission and ensure that the application is complete. <br />Incomplete applications will be promptly rejected and the applicant shall be notified in <br />writing of the deficiencies. The applicant shall be given an opportunity to cure any <br />incomplete or deficient application prior to the conclusion of the application processing <br />term, if such time period is applicable. <br />3. Phase 2 - Regulatory Safety Permit Application <br />a. Each applicant identified on the RSP Eligibility List may choose to <br />complete and file a RSP application to the Director of Planning and Building. The <br />application shall be filed together with a nonrefundable fee as established by resolution <br />of the City Council, to defray the cost of investigation required by this article. <br />b. The RSP application period shall be open for thirty (30) calendar days and <br />may run concurrently with the Phase 1 review period. Following the RSP application <br />Ordinance No. NS -XXX <br />Page 20 of 33 <br />75B-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.