My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH CANNABIS TESTING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
02/20/2018
>
75B - PH CANNABIS TESTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 2:09:00 PM
Creation date
2/15/2018 6:50:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
2/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
period, the Director of Planning and Building or designee(s) shall stop accepting <br />applications and review all applications received in Phase 2. <br />C. The Director of Planning and Building or designee(s) will review all <br />application documents required in the City's Phase 2 application package plus the <br />additional requirements in subsection (d) below. The Director of Planning and Building <br />or his or her designee(s) will use a merit based point system to review and rank each of <br />applications from the most to the least points and objectively award the top applicants a <br />RSP. A complete description of the merit based point system and all merit based point <br />considerations shall be included with the application forms. <br />Phase 2 requirements include but are not limited to; <br />i. All application documents required in the City's Phase 2 RSP <br />application package. <br />ii. Phase 2 application fee is.paid and a comprehensive owner <br />background check is completed. <br />iii. The Building Official or designee has inspected all structures in <br />which the use is located to determine that all applicable standards <br />and requirements are met. If a building permit is required for site <br />improvements, Permit issuance will be deferred until a bertificate of <br />occupancy or other building permit approval is issued. Additionally, <br />the Building Official has determined that there are no notices of <br />nuisance or other code compliance issues recorded or on the <br />property. <br />iv. The PlanningManager or designee has issued a Zoning Clearance <br />documenting compliance with the following: <br />1. The use is permitted; <br />2. All land use permits, if any, have been approved and all <br />Conditions of approval have been met or are in good <br />standing; and, <br />3. No zoning violations exist on the property. <br />e. The Director of Planning and Building or his or her designee(s) shall <br />review each application upon submission and ensure that the application is complete. <br />Incomplete applications will be promptly rejected and the applicant shall be notified that <br />business day of the deficiencies. The applicant shall be given an opportunity to cure any <br />incomplete or deficient application prior to the conclusion of the application processing <br />term, if such time period is applicable. <br />4. Regulatory Safety Permit Annual Renewal <br />Ordinance No. NS -XXX <br />Page 21 of 33 <br />75B-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.