My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALFARO COMMUNICATIONS CONSTRUCTION, INC. (CROSSWALK UPGRADES - PHASE I)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ALFARO COMMUNICATIONS CONSTRUCTION, INC. (CROSSWALK UPGRADES - PHASE I)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 5:42:24 PM
Creation date
2/16/2018 10:52:37 AM
Metadata
Fields
Template:
Contracts
Company Name
ALFARO COMMUNICATIONS CONSTRUCTION, INC. ‎(CROSSWALK UPGRADES - PHASE I)‎
Contract #
15-6831
Agency
Public Works
Council Approval Date
5/16/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO„ 15-6831 <br />CROSSWALK UPGRADES - PHASE I <br />FEDERAL PROJECT NO: HSIPL 5063(155) <br />Local Assistance Procedures Manual Exbibit 16-B <br />Subcontracting Request <br />INSTRUCTIONS FOR COMPLETING SUBCONTRACTING REQUEST FORM <br />All First-tier subcontractors must be included on a <br />subcontracting request. <br />Submit in accordance with Section 8-1.01 of the Caltrans Standard Specifications. <br />Type or print requested information. Information copy is to be retained by the <br />contractor. Submit other copies to project's Resident Engineer. After approval, the <br />original will be returned to the contractor, <br />When an entire item is subcontracted, the value to be shown is the contractor's bid <br />price. <br />When a, portion of an item is subcontracted, describe the portion, and show the % <br />of bid item and value. <br />THIS FORM IS NOT TO BE USED FOR <br />SUBSTITUTIONS. <br />Prior to submittal of a DC -CEM -1201 involving a replacement Subcontractor, <br />submit a separate written request for approval to substitute a listed subcontractor. <br />Section 4107 of the Government Code covers the conditions for substitution. <br />Submit a separate written request for approval of any DBE/MBE/WBE/DVBE <br />substitution. Include appropriate backup information and state what efforts were <br />made to accomplish the same dollar value of work by other certified <br />DBE/MBE/WBE/DVBEs. <br />NOTE: For contractors who will be performing work on railroad property, it is necessary <br />for the contractor to complete and submit the Certificate of Insurance (State Form <br />DH-OS-A10A) naming the subcontractor as insured. No ivork shall be allowed <br />which involves encroachment on railroad property until the spectfred insurance has <br />been approved. <br />Page 2 of 2 <br />July 2016 <br />P-36 of P-40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.