My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALFARO COMMUNICATIONS CONSTRUCTION, INC. (CROSSWALK UPGRADES - PHASE I)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ALFARO COMMUNICATIONS CONSTRUCTION, INC. (CROSSWALK UPGRADES - PHASE I)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 5:42:24 PM
Creation date
2/16/2018 10:52:37 AM
Metadata
Fields
Template:
Contracts
Company Name
ALFARO COMMUNICATIONS CONSTRUCTION, INC. (CROSSWALK UPGRADES - PHASE I)
Contract #
15-6831
Agency
Public Works
Council Approval Date
5/16/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.:15-6$31 <br />CROSSWALK UPGRADES - PHASE I <br />FEDERAL PROJECT NO: HSIPL 5063(155) <br />DIFFERING SITE CONDITIONS <br />The undersigned, is submitting this proposal for performing by contract the work required by <br />these bid documents, certify to comply with the following: <br />a. Contractor'sNotifeation <br />Promptly notify the Agency's Engineer if you find either of the following conditions: <br />1. Physical conditions differing materially from either of the following: <br />o Contract documents <br />• Job site examination <br />2. Physical conditions of an unusual nature, differing materially <br />from those ordinarily encountered and generally recognized as <br />inherent in the work provided for in the Contract <br />Include details explaining the information you relied on and the material <br />differences you discovered. If you fail to promptly notify the Engineer, you waive <br />the differing site condition claim for the period between your discovery of the <br />differing site condition and your notification to the Engineer. <br />If you disturb the site after discovery and before the Engineer's investigation, you <br />waive the differing site condition claim. <br />b. Engineer's Investigation and Decision <br />Upon your notification, the Engineer investigates job site conditions and: <br />1. Notifies you whether to resume affected work <br />2. Decides whether the condition differs materially and is cause for an <br />adjustment oftime, payment, or both C� , <br />Signed <br />Title <br />Firm Alfaro Conueuauteadons Construction,Inc. <br />Date moi-- v 11- <br />P-37 of P-40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.