My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY-HORN AND ASSOCIATES - 2018
Clerk
>
Contracts / Agreements
>
K
>
KIMLEY-HORN AND ASSOCIATES - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 11:18:05 AM
Creation date
2/28/2018 9:18:34 AM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY-HORN AND ASSOCIATES
Contract #
A-2018-025
Agency
PUBLIC WORKS
Council Approval Date
2/6/2018
Expiration Date
2/5/2020
Insurance Exp Date
4/1/2020
Destruction Year
2025
Document Relationships
KIMLEY-HORN AND ASSOCIATES
(Amended By)
Path:
\Contracts / Agreements\K
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kimley)))Horn <br />Warner Avenue Street Improvements 1/10/2018 <br />Deliverables: Precise alignment and geometry design plans <br />Task 7: Removal Plans <br />We will provide demolition plans to identify removals of known facilities/improvements within the <br />limits of work. This entails showing removal of primary features such as pavement, curb/gutter, <br />concrete ditch, sidewalk, fencing, signs, guard rail, and large trees. Removal plans will be <br />prepared at a scale of 1" = 20' horizontal. <br />Deliverables: 30%, 60%, 95%, and 100% Plans, electronic files in Microstation V81 and PDF <br />(final plans will be sealed and signed), and responses to previous review comments from the <br />city <br />Task 8: Street Improvement Plans <br />Kimley-Horn will develop a street improvement plan for the construction of roadway <br />improvements consisting of new medians, bike lanes, sidewalks, curb ramps, and roadway <br />pavement improvements for the project limits, per City's RFP. Basis for these plans will be the <br />approved precise alignment and geometry design as part of Task 6. The plans will show <br />horizontal and vertical design information. Roadway plans will be prepared at a scale of 1" = 20' <br />horizontal and 1" = 2' vertical for profiles. We will use the City's provided field surveys for base <br />mapping. Vertical design information for construction of new medians, and curbs will be <br />indicated on the plans with profiles. Details and typical sections will be added as indicated in the <br />drawing list provided with our fee. Necessary adjustments to surface utility features will be <br />identified and addressed with call outs and construction notes. We will prepare details for items <br />that deviate from published standards. Plan preparation will be coordinated with the City, other <br />agencies such as Orange County Fire Authority, Community Development Agency, Orange <br />County Transportation Authority (OCTA), and utility companies. Modifications to existing water <br />and sewer mains are not anticipated for this project. <br />Deliverables: 30%, 60%, 95%, and 100% Plans, electronic files in Microstation V81 and PDF <br />(final plans will be sealed and signed), and responses to previous review comments from the <br />city <br />Task 9: Offsite Improvement Plans <br />Our team will provide offsite improvement plans to address necessary improvements within <br />private property such as sign relocations (10 feet high or shorter), parking lot adjustment(s), <br />lighting relocations, and landscape and irrigation modifications. Offsite improvement plans will <br />address modifications to the frontage of the properties resulting of roadway widening. Major <br />parking lot reconfiguration, drainage improvements, building and structural modifications, <br />architectural design, and offsite utility modification are excluded from this scope of services. <br />Offsite improvements plans will be prepared at a scale of 1" = 20' horizontal. We assume <br />modifications for offsite improvements will match existing features. <br />Deliverables: 30%, 60%, 95%, and 100% Plans, electronic files in Microstation V81 and PDF <br />(final plans will be sealed and signed), and responses to previous review comments from the <br />City <br />Task 10: At -Grade Railroad Crossing Plans <br />Our team will prepare railroad at -grade crossing plans at a scale of 1 "=20' for the improvements <br />required due to the widening and realignment of Warner Avenue. Improvements will consist of <br />4 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.