My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY-HORN AND ASSOCIATES - 2018
Clerk
>
Contracts / Agreements
>
K
>
KIMLEY-HORN AND ASSOCIATES - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 11:18:05 AM
Creation date
2/28/2018 9:18:34 AM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY-HORN AND ASSOCIATES
Contract #
A-2018-025
Agency
PUBLIC WORKS
Council Approval Date
2/6/2018
Expiration Date
2/5/2020
Insurance Exp Date
4/1/2020
Destruction Year
2025
Document Relationships
KIMLEY-HORN AND ASSOCIATES
(Amended By)
Path:
\Contracts / Agreements\K
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KidepMorn <br />Warner Avenue Street Improvements <br />1/10/2018 <br />determined as part of Task 4. Potential conflicts with existing utilities will be shown on profiles <br />with approximate location of utilities, per the utility agencies readily available record drawings. <br />Storm drain plans will be prepared at a scale of 1" = 20' horizontal and 1" = 2' vertical for <br />profiles. <br />Deliverables: 60%, 95%, and 100% Plans, electronic files in Microstation V81 and PDF, and <br />responses to previous review comments from the City <br />Task 14: Street Light and Electrical Plans <br />Kimley-Horn will prepare street light plans for Warner Avenue from Wright Street to Oak Street. <br />Plans will incorporate street lighting along both sides of the street. We will conduct voltage drop <br />calculations to determine the wiring sizes. We anticipate we will need to connect to existing <br />service locations along the corridor. New service point locations may be necessary. <br />Coordination with Southern California Edison to determine new and existing service points to be <br />used will be a part of this task. We will provide a photometric analysis to determine required <br />illumination for the corridor. The street light plans will be prepared on 24" x 36" full-size sheets. <br />Decorative street lighting fixtures are excluded from this scope of services. <br />Deliverables: 60%, 95%, and 100% Plans, electronic files in Microstation Val and PDF (final <br />Plans will be sealed and signed), responses to previous review comments from the City <br />Task 16: Traffic Signal and Signal Interconnect Plans <br />We will prepare traffic signal and signal interconnect plans to incorporate the improvements and <br />street widening along Warner Avenue. Traffic signal plans will include intersections of: Wright <br />Street, Grand Avenue, Standard Avenue, Halladay Street and at the Orange County Fire <br />Station. Installation closed-circuit television (CCTV), video detection, conduits, and cables or <br />modification of existing communication systems is anticipated within the project limits and will be <br />shown on the traffic signal plans. The traffic signal interconnect plans will modify/install signal <br />interconnect, single -mode fiber optics (SMFO), conduits, and cables for the existing <br />communication system within the project limits. Plans will show the connection to each <br />signalized intersection within the project limits. Pull box details and modification of conduit <br />sweeps for the signal interconnect are included as part of this task. The traffic signal <br />modification plan will be prepared in accordance with current City and Caltrans standards and <br />will be prepared at a scale of 1" = 20' on a 24" x 36", full-size sheet. The traffic signal <br />interconnect plan will be at a scale of 1" = 40' on a 24" x 36", full-size sheets. Fiber assignment <br />diagrams are not in this scope of work. <br />Deliverables: 60%, 95%, and 100% Plans, electronic files in Microstation V81 and PDF (final <br />plans will be sealed and signed), and responses to previous review comments from the City <br />Task 16: Specifications <br />Kimley-Horn will prepare technical specifications based upon the boiler plate supplied by the <br />City. Bid items will be described as reasonably required in the General Provisions and will be <br />included in the Contractor's bid list. References for the technical provisions to the City's <br />Standards and Standard Specifications for Public Works Construction (Greenbook), Caltrans, or <br />other appropriate specifications will be shown. <br />6 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.