My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - PWA STATUS CIP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
03/06/2018
>
19C - PWA STATUS CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2018 7:02:13 PM
Creation date
3/1/2018 6:50:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Attorney's Office
Item #
19C
Date
3/6/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monthly CIP Executive Report for February 2018 <br />March 6, 2018 <br />Page 2 <br />notice and door hangers for any water service interruption. Construction will tentatively begin <br />May 2018. <br />All the water mains, services, fire hydrants, and appurtenances will be replaced in the <br />neighborhood including Sail Street, Highland Street, Deming Street, Kedge Avenue, Maxine <br />Street, Wisteria Place, Flight Avenue, Ballast Avenue, Crystal Lane, and Lahnaardt Avenue. <br />Warner Improvements/Widening - Main Street to Oak Street <br />Warner Avenue Improvements Phase 1 from Main Street to Oak Street commenced the right-of- <br />way acquisition process in August 2017. This process has led to the first few acquisitions based <br />on amicable negotiations. Three purchase agreements were recently approved by City Council, <br />and four more are being submitted for City Council approval in March 2018. <br />Staff will continue to coordinate with the right-of-way consultants and the property owners and/or <br />tenants to complete the remaining 11 full property acquisitions and 5 partial property acquisitions. <br />The design of the street improvements is now underway as a result of the council approved <br />design agreement with Kimley-Horn and Associates in February 2018. <br />The engineering services will include both Phase 2A (Oak Street to Grand Avenue) and Phase <br />2B (Grand Avenue to Wright Street) of the project. <br />Installation of 29 New Bus Shelters <br />The installation of the 29 bus shelters has been completed. As an enhancement to this project, <br />graphic panels with safety messaging were recently installed on all new bus shelters, in <br />alignment with the Safe Mobility Santa Ana Plan. <br />Staff is not yet done, and will be researching for grants and /or financing to replace more bus <br />shelters, ultimately leading to replacing all of them. Staff is also looking for ways to provide Wi-Fi <br />access to selected shelters as a demonstration project which would also provide commuters with <br />real time electronic passenger information display signs, and also generate advertising revenue <br />from electronic ads. <br />Seventeenth Street Medians <br />Staff is currently doing research to determine the best approach to retrofitting irrigation in street <br />medians so existing trees can be watered most effectively. Thereafter, bids will be sought to <br />engage a construction contractor to install an irrigation system conversion. <br />Staff has been working with the Environmental and Transportation Advisory Committee (ETAC) <br />to select the location of this demonstration project, and will also look to receive feedback from <br />ETAC upon completion of the irrigation system design. Seventeenth Street will be the pilot <br />location, with improvements beginning at the east city limit (Penn Way) and working east to west. <br />19C-2 <br />