My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-03-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
03/06/2018
>
FULL PACKET_2018-03-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 9:34:31 AM
Creation date
3/5/2018 9:12:08 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
3/6/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Award Contract to Michels Pipeline Construction for West Grove Valley <br />Neighborhood Water Main Improvements Project <br />March 6, 2018 <br />Page 2 <br />eligible construction contracts. The following is a summary of the bid invitations made and the bids <br />received: <br />Contractor Participation Data <br />Santa Ana contractors receiving notices <br />14 <br />Contractors requesting bidding documents <br />25 <br />Bids received <br />7 <br />Bids received from Santa Ana contractors <br />0 <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID + ITEM 18 <br />1 <br />Michels Pipeline Construction <br />Brownsville, WI <br />$2,388,076 <br />2 <br />Stephen Doreck Equipment Rentals, Inc. <br />Pico Rivera, CA <br />$2,586,405 <br />3 <br />Ferreira Construction Company <br />Chino, CA <br />$2,624,711 <br />4 <br />TBU, Inc. <br />Beaumont, CA <br />$2,685,670 <br />5 <br />Big Ben, Inc. <br />Irvine, CA <br />$2,739,280 <br />6 <br />AMPCO Contracting, Inc. <br />Anaheim, CA <br />$2,814,216 <br />7 <br />USS Cal Builders, Inc. <br />Stanton, CA <br />Non-responsive <br />A total of seven bids were received and six bids were considered responsive. Michels Pipeline <br />Construction submitted the lowest responsive bid in the amount of $2,388,076 (Exhibit 2), which is <br />comparable to the Engineer's Estimate of $2,250,000. Staff included bid item #18 as an additive <br />alternate to install bollards (steel pipes) for protecting certain fire hydrants. This line item is reasonably <br />priced at $2,000, which results in a total construction contract of $2,388,076. Based on a bid analysis and <br />a contractor's performance reference check, staff recommends awarding the construction contract to <br />Michels Pipeline Construction (Exhibit 3). <br />STRATEGIC PLAN ALIGNMENT <br />Approval of this item supports the City's efforts to meet Goal #6 - Community Facilities & Infrastructure, <br />Objective #1 (establish and maintain a Community Investment Plan for all City assets), Strategy C (invest <br />resources and technology to extend the service life of existing infrastructure to protect the City's <br />investment and support a high quality of life standard). <br />20A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.