My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LOS ANGELES ENGINEERING, INC.,
Clerk
>
Contracts / Agreements
>
PROJECTS
>
LOS ANGELES ENGINEERING, INC.,
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 11:48:48 AM
Creation date
3/5/2018 11:34:49 AM
Metadata
Fields
Template:
Contracts
Company Name
LOS ANGELES ENGINEERING, INC.,
Contract #
Various
Agency
Public Works
Council Approval Date
6/20/2017
Document Relationships
23A - CONTRACT CONSTRUCTION OF BRISTOL ST IMPROV, WATER MAIN AND SEWER MAIN IMPROV
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2017\06/20/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />CITY OF SANTA ANA AuoENouM ONE <br />PROPOSAL, <br />PROJECTNO, 11-6740: BRISTOL STREET IMPROVEMENTS AND WIDENING FROM; <br />WASHINGTON AVENUE TO 17TH STREET <br />PROJECTNO. 17.64.72; BRISTOL STREET WATER MAIN IMPROVEMENTS FROM <br />WASHINGTON AVENUE TO 17"" STREET <br />PROJECT NO. 17-6473: BRISTOL STREET SEWER MAIN IMPROVEMENTS FROM <br />WASHINGTON AVENUE TO 1'7 "STREET <br />TOTAL BASE BID <br />$ r 7 <br />TOTAL ADD ALTERNATE A BID <br />$ ;3^7 Ooo <br />The lowest responsible bidder shall be selected based on the total base bid, The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item, shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, End the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />t This bid item is considered a Spec itilty Item per Section 2-3.2 of the Standard Specifications, <br />TIME; FOR COMPLETION OF IMPROVEMENTS AND LIQUIDAT,FD_D jMAC ES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within 190 worlclne dayyg (not including the one-year landscape maintenance <br />period) after the commcncement date stated in the Notice to Proceed, <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6.9 of the <br />Standard Specifications, shall be $3.500 per calendar day. <br />Narne of Firm <br />Signature of BIDDER <br />Title Aaron O'Brien, Secretary <br />(If an Individual, so state. If a firm or co-parmership, state the firm name and give the names of <br />all individual copartners composing the firm. If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and Managor, thereof,) <br />Los Angeles Engineering, Inc. - Corporation <br />Angus O'Brien - President <br />Aaron O'Brien - Secretary <br />Beth Ballard - CFO <br />P-8 of P-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.