My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LOS ANGELES ENGINEERING, INC.,
Clerk
>
Contracts / Agreements
>
PROJECTS
>
LOS ANGELES ENGINEERING, INC.,
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 11:48:48 AM
Creation date
3/5/2018 11:34:49 AM
Metadata
Fields
Template:
Contracts
Company Name
LOS ANGELES ENGINEERING, INC.,
Contract #
Various
Agency
Public Works
Council Approval Date
6/20/2017
Document Relationships
23A - CONTRACT CONSTRUCTION OF BRISTOL ST IMPROV, WATER MAIN AND SEWER MAIN IMPROV
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2017\06/20/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA ADDENDUM ONE <br />PROPOSAL <br />PROJECT NO. 11-6740: BRISTOL STREET IMPROVEMENTS AND WIDENING FROM <br />WASHINGTON AVENUE TO 17TH STREET <br />PROJECT NO. 17-6472: BRISTOL STREET WATER MAIN IMPROVEMENTS FROM <br />WASHINGTON AVENUE TO 17TH STREET <br />PROJECT NO. 17-6473: BRISTOL STREET SEWER MAIN IMPROVEMENTS FROM <br />WASHINGTON AVENUE TO 17TH STREET <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />12. <br />Cross -Gutter (Arterial Street) <br />2,000 <br />SF <br />$ <br />$ <br />t,.�' <br />Noon T <br />13. <br />Concrete Bus Pad <br />2,400 <br />SF <br />$ <br />$ <br />S J <br />lid' <br />14. <br />PCC Protected Bike Lane (6") <br />1,800 <br />LF <br />$ <br />$ <br />btD" <br />15. <br />Decorative PCC Plaza <br />1,700 <br />SF <br />$ <br />$ <br />2 <br />16. <br />PCC Bike Lane at Driveways (8") <br />3,100 <br />SF <br />$ <br />$ <br />BU` <br />'31 ow <br />17. <br />Adjust Manhole Frame and Cover to Finished <br />12 <br />EA <br />$ <br />$ <br />Grade <br />IOL�' <br />p2e<mcJ "" <br />18. <br />Furnish and Install New Water Valve Frame <br />12 <br />EA <br />$ <br />$ <br />and Cover <br />Nbo — <br />!..}?()C> — <br />19. <br />Adjust Sewer and Drainage Manhole to <br />23 <br />EA <br />$ <br />$ <br />Finished Grade <br />) ovo ' <br />23j <br />20. <br />Landscaping <br />1 <br />LS <br />$ <br />$ <br />3 76o0 <br />3 70()(—' <br />21, <br />Irrigation <br />1 <br />LS <br />$ <br />$ <br />,�'336cxD <br />233 MD <br />22. <br />1 -Year Landscaping Maintenance Period <br />1 <br />LS <br />$ <br />$ <br />56001-)— — <br />56 POO <br />23. <br />Construction Signs <br />4 <br />EA <br />$ <br />$�-�^ <br />24. <br />Three 4" conduit on west side of Bristol <br />1,500 <br />LF <br />$ <br />$ <br />25. <br />Stamped Concrete at Median Island <br />100 <br />SF <br />$ <br />$ <br />IUd <br />/nC)OO <br />26. <br />Trench, Shoring and Plating <br />1 <br />LS <br />$ <br />$ <br />G�3J�� <br />�o'3`J'�✓ <br />27. <br />12" Reinforced Concrete Pipe (2500-D) per <br />6 <br />LF <br />$ <br />$ <br />City Standard Plan 1150 <br />1TOO <br />28. <br />18" Reinforced Concrete Pipe (2500-D) per <br />249 <br />LF <br />$ <br />$ <br />City Standard Plan 1150 <br />r 00.. <br />qq vc)o" <br />29. <br />30" Reinforced Concrete Pipe (2500-D) per <br />862 <br />LF <br />$ <br />$ <br />City Standard Plan 1150 <br />va115 -- <br />I1.3 q5 0 <br />30. <br />Reinforced Concrete Collar (D=12") per City <br />1 <br />EA <br />$ <br />$ <br />Standard Plan 320 <br />Jefo <br />j 6zy <br />P-2 of P-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.